Optimasi Penjadwalan Maintenance Pada Perusahaan Kosmetik Menggunakan Metode Power Law Process

Shabrina, Alya Nur (2023) Optimasi Penjadwalan Maintenance Pada Perusahaan Kosmetik Menggunakan Metode Power Law Process. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 6032201182-Master_Thesis.pdf] Text
6032201182-Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2025.

Download (1MB) | Request a copy

Abstract

Perusahaan manufaktur yang menjadi objek pada penelitian ini adalah perusahaan yang bergerak dibidang kosmetik yang berdiri di Kawasan Industri Surabaya. Meskipun merupakan pabrik baru tetapi kapasitas produksi pada pabrik tersebut cukup tinggi. Breakdown mesin merupakan salah satu hal yang harus dihindari pada proses karena akan menyebabkan berkurangnya output produksi dan berpengaruh terhadap omset perusahaan. Proses produksi kosmetik tediri dari beberapa tahapan yaitu proses timbang, mixing, filling¸dan packing. Berdasarkan data dan isu historical, mesin yang critical pada proses produksi adalah mesin mixing. Hal ini dikarenakan pada mesin mixing kerugian yang bisa dialami perusahaan cukup besar jika terjadi abnormality pada komponen mesin. Selain dapat menghambat proses produksi, kontaminasi pada produk di proses mixing akan menyebabkan kerugian dalam bentuk materi dan juga waktu. Pada penelitian ini akan dilakukan pemodelan untuk mendapatkan waktu optimum penggantian komponen mesin Mesin yang menjadi objek penelitian yaitu mesin vacuum emulsifier. Model yang digunakan pada penelitian ini adalah Power Law Processs. Alasan penggunaan model Power Law Process adalah karena mesin yang menjadi objek amatan repairable dan kemungkinan besar laju kerusakannya meningkat seiring berjalannya waktu. Tujuan dari penelitian ini adalah untuk mengurangi terjadinya kerusakan komponen mesin, dan meningkatkan availability mesin. Hasil dari penelitian ini adalah waktu penggantian optimum komponen mesin adalah ketika mesin mencapai waktu operasional pemakaian 3777 hours meter atau pada saat komponen mengalami kerusakan ke-6, tergantung mana yang lebih dahulu terjadi. Perkiraan biaya akibat kerusakan adalah Rp 4.146 per hours meter atau setara dengan Rp 14.269.212 per rata-rata waktu operasional pergantian komponen. Perbandingan biaya kebijakan maintenance eksisting dengan biaya akibat kerusakan sesudah proses optimasi adalah sebesar 10,1%.
===============================================================================================================================
Observed company is a manufacturing company in cosmetics field that located in Industrial Area in Surabaya. Although the company is still newly established, but the production capacity is high. Machines breakdown are one of disruption issue that must be avoided because it can lead to production output decreased and affect company sales income. Cosmetics product manufacturing process consists of several different steps which are weighing, mixing, filling and packing. Based on the historical data and issue, critical machine in this company is mixing machine because if there are problems in this process, it will cause company losses in time and also cost. Beside that, abnormality in mixing process will lead to product contamination that will generate quality issues. In this research, modelling will be done to define optimal time of machine component replacement. Machine that will be the research object is vacuum emulsifier machine. Model used in this research is Power Law Process. The used of Power Law Process is because the researched machines are repairable and most likely the rate of machine failure increases as time goes by. The purpose of this research is to reduce the occurrence of damage to machine components and increase machine availability. The results of this research the optimum maintenance schedule or optimum time of machine component changed is when the component reach 3777 hours meter operational time or when it reach their sixth failure, depends on what occurred first. Estimation cost of failure is Rp 4.416 per hours meter or Rp 14.269.212 per mean time to replacement. The comparison of existing maintenance cost compared with the optimum cost is reduced by 10,8%.

Item Type: Thesis (Masters)
Uncontrolled Keywords: MTTF, Power Law Process, MTBF, Non Homogenous Poisson Process
Subjects: T Technology > TH Building construction > TH3351 Maintenance and repair
Divisions: Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT)
Depositing User: Alya Nur Shabrina
Date Deposited: 14 Feb 2023 02:16
Last Modified: 14 Feb 2023 02:16