Peningkatan Kapasitas dan Efisiensi Proses Produksi E-Trail Bangkits Cendrawasih M.01 dengan Metode Value Stream Mapping

Hernadi, Natasha Levina Angelyn (2023) Peningkatan Kapasitas dan Efisiensi Proses Produksi E-Trail Bangkits Cendrawasih M.01 dengan Metode Value Stream Mapping. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 02111540000027-Undergraduate_Thesis.pdf] Text
02111540000027-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2025.

Download (2MB) | Request a copy

Abstract

Institut Teknologi Sepuluh Nopember (ITS) berinovasi dalam menciptakan ekosistem yang lebih ramah lingkungan dengan menciptakan transportasi berbasis listrik, salah satunya adalah Motor Etrail Bangkits Cendrawasih M.01. Proses produksi dilakukan di Gedung Forensik ITS. Dalam 1 minggu, dari tim produksi bisa menghasilkan 2 motor trail listrik. Beberapa bagian dari motor yang diproduksi sendiri adalah rangka, body, box baterai, dudukan lampu, manajemen energi. sistem perkabelan dan sel baterai. Untuk proses produksi per bagian motor tim Manajemen Energi menghabiskan waktu 3237 detik untuk menghasilkan 2 produk, tim Perkabelan menghabiskan waktu 5105 detik untuk menghasilkan 1 rangkaian kabel, tim baterai menghabiskan waktu 13710 detik untuk menghasilkan 2 buah baterai, dan tim bengkel menghabiskan waktu 16123 detik untuk menghasilkan 2 rangka, 12123 detik untuk 3 dudukan lampu, 25.081.2 detik untuk 2 box baterai, dan 25.081.2detik untuk menghasilkan 2 body motor. Hal tersebut terhitung sangat lama dalam produksi 1 motor. Dalam suatu produksi, motor Etrail terhitung kapasitas yang sedikit dengan waktu yang cukup lama.
Penelitian dalam tugas akhir ini dimulai dengan identifikasi masalah dan studi pustaka. Metode yang digunakan adalah dengan menggunakan Value Stream Mapping. Proses produksi digambarkan dengan Big Picture Mapping. Gambaran dari Big Picture Mapping menunjukkan bahwa penyebab lamanya proses produksi adalah pada pembuatan body motor dan box baterai motor. Metode Value Stream Analysis Tool (VALSAT) digunakan untuk mengetahui waste yang terjadi pada saat evaluasi teknis, sehingga dapat dilakukan perbaikan untuk meminimalisirnya.
Setelah melakukan penelitian, Tugas Akhir ini menghasilkan evaluasi bahwa proses pembuatan b body motor dan box baterai memakan waktu delay yang paling banyak dikarenakan sumber daya melakukan banyak pergerakan yang tidak perlu karena perpindahan tempat untuk mengerjakan tiap bagiannya. Proses delay juga memakan waktu yang cukup lama, karena waktu idle yang tidak dimanfaatkan dengan baik. Usulan perbaikan yang dapat dilakukan adalah membuat tempat yang lebih tertata untuk tiap bagian motor yang diproduksi. Tempat yang tertata akan mengurangi pergerakan yang memakan waktu dan pergerakan operator dan komponen tidak berlebihan. Yang kedua membuat jadwal aktivitas operator, dengan mengisi waktu idle dengan aktivitas yang bernilai tambah Perbaikan yang dilakukan ini dapat meningkatkan kapasitas dari box baterai Etrail Bangkits Cendrawasih M.01.yang semula 2 buah dalam 1 hari menjadi 10 buah dalam 1 hari, lalu pergerakan komponen dan operator lebih teratur dan tidak berlebihan.
==================================================================================================================================
The Sepuluh Nopember Institute of Technology (ITS) is innovating in creating a more environmentally friendly ecosystem by creating electricity-based transportation, one of which is the Bangkits Cendrawasih M.01 Etrail Motor. The production process is carried out in the ITS Forensic Building. In 1 week, the production team can produce 2 electric trail bikes. Some parts of the self-produced motorbike are the frame, body, battery box, lamp holder, energy management. wiring system and battery cells. For the production process per motor part, the Energy Management team spent 3237 seconds to produce 2 products, the Cabling team spent 5105 seconds to produce 1 set of cables, the battery team spent 13710 seconds to produce 2 batteries, and the workshop team spent 16123 seconds to produce produces 2 frames, 12123 seconds for 3 lamp holders, 16476 seconds for 2 battery boxes, and 16356 seconds for 2 motor bodies. It is considered very long in the production of 1 motor. In a production, Etrail motors have a small capacity with a long time.
Research in this final project begins with problem identification and literature study. The method used is to use Value Stream Mapping. The production process is described by Big Picture Mapping. The description of Big Picture Mapping shows that the reason for the length of the production process is in the manufacture of the motor body and the motor battery box. The Value Stream Analysis Tool (VALSAT) method is used to find out the waste that occurs during technical evaluation, so that improvements can be made to minimize it.
After conducting research, this Final Project resulted in an evaluation that the process of making b body motors and battery boxes took the most delay because the resources made a lot of unnecessary movements due to moving places to work on each part. The delay process also takes quite a long time, because the idle time is not utilized properly. Proposed improvements that can be made are to make a more organized place for each part of the motor that is produced. Organized space reduces time-consuming movements and minimizes movement of operators and components. The second is to schedule operator activities, by filling idle time with value-added activities. This improvement can increase the capacity of the Etrail Bangkits Cendrawasih M.01 battery box, which was originally 2 in 1 day to 10 in 1 day, then component movement and operators are more regular and not excessive.

Item Type: Thesis (Other)
Uncontrolled Keywords: Efficiency, Production, Value Stream Mapping, Efisiensi, Produksi, Value Stream Mapping
Subjects: H Social Sciences > HE Transportation and Communications > HE311.I4 Urban transportation
Divisions: Faculty of Industrial Technology and Systems Engineering (INDSYS) > Mechanical Engineering > 21201-(S1) Undergraduate Thesis
Depositing User: Natasha Levina Angelyn Hernadi
Date Deposited: 24 Feb 2023 08:23
Last Modified: 24 Feb 2023 08:23
URI: http://repository.its.ac.id/id/eprint/97699

Actions (login required)

View Item View Item