Setyadarmawan, Risky Arif (2022) Laporan Kegiatan Magang Manyar Smelter Project PT. Wijaya Karya (Persero) Tbk. Gresik, Jawa Timur. Project Report. [s.n.], [s.l.]. (Unpublished)
Text
03111940000050-Project_Report.pdf Download (6MB) |
Abstract
Teknik Sipil merupakan salah satu cabang ilmu teknik yang mempelajari mengenai perencanaan, pembangunan, dan pemeliharaan bangunan serta infrastruktur. Dalam proses Pendidikan yang dilakukan oleh mahasiswa di perguruan tinggi, proses Pendidikan yang dilakukan oleh mahasiswa masih terbatas antara pemberian teori dan praktik yang ada. Sehingga dalam penerapannya mahasiswa masih kurang dalam kegiatan praktik dalam mempraktikkan ilmu yang didapat di bangku perkuliahan. Untuk menyempurnakan ilmu yang didapatkan di bangku perkuliahan tentu harus dilakukan penyempurnaan dangan pengalaman praktik kerja di lapangan sebagai bekal mahasiswa dalam menghadapi dunia kerja. Alur penyusunan permit terdiri dari :Penyerahan dokumen shop drawing ke main contractor ;Penyerahan dokumen MSDS ke main contractor Penyerahan dokumen Working Method Satement dan JSA ke main contractor; Inspeksi equipment/tools dan sertifikat operator; Pengajuan Working Permit.
===============================================================================================================================
Civil Engineering is a branch of engineering that studies the planning, construction and maintenance of buildings and infrastructure. In the educational process carried out by students in tertiary institutions, the educational process carried out by students is still limited between the provision of existing theory and practice. So that in practice students are still lacking in practical activities in practicing the knowledge gained in lecture benches. To perfect the knowledge gained in lectures, of course, improvements must be made with practical work experience in the field as a provision for students to face the world of work. The permit preparation flow consists of: Submission of shop drawing documents to the main contractor; Submission of MSDS documents to the main contractor Submission of Working Method Statement and JSA documents to the main contractor; Inspection of equipment/tools and operator certificates; Submission of Working Permits.
Actions (login required)
View Item |