Abstract

Dalam proyek konstruksi salah satu faktor yang menentukan kualitas dan keberhasilan adalah tenaga kerja. Untuk mencapai pekerjaan yang telah direncanakan pada proyek konstruksi sangat dipengaruhi oleh tingkat produktivitas tenaga kerja. Salah satunya adalah pekerjaan penulangan dan bekisting pekerjaan struktur. Penelitian ini bertujuan untuk menganalisa produktivitas tenaga kerja pada pekerjaan struktural khususnya penulangan dan bekisting dan mencari faktor apa saja yang dapat mempengaruhi produktivitas tenaga kerja. Penelitian ini dilakukan dengan menggunakan metode time study untuk melakukan perhitungan produktivitas tenaga kerja. Metode time study adalah metode pengukuran produktivitas tenaga kerja di lapangan dengan cara menentukan standard time suatu pekerjaan. Pengambilan data dilapangan dengan melakukan observasi secara langsung di lokasi proyek. Pengamatan dilakukan untuk mendapatkan volume dan waktu pengerjaan tiap pekerjaan. Pada pengamatan akan diukur nilai basic time yang akan diolah menjadi standard time, dan digunakan untuk menghitung nilai produktivitas. Dari hasil perhitungan didapatkan nilai produktivitas tenaga kerja pekerjaan struktural pada pekerjaan bekisting kolom, bekisting balok, dan bekisting pelat berturut-turut adalah 9,67 m2/OH, 11,58m2/OH, dan 13,74m2/OH. Untuk nilai produktivitas pasa pekerjaan tulanagn kolom, tulangan balok, dan tulangan pelat berturut-turut adalah 472,10 kg/OH, 368,76 Kg/OH, 470,09Kg/OH. Dari hasil analisa mengenai faktor-faktor yang dapat mempengaruhi produktivitas berdasarkan kondisi dilapangan, terdapat dua faktor yang dapat mempengaruhi produktivitas pa.
===============================================================================================================================
In a construction project, one of the factors that determine quality and success is labor. To achieve the work that has been planned on a construction project is strongly influenced by the level of labor productivity. One of them is reinforcement work and formwork structural work. This study aims to analyze labor productivity in structural work, especially iron and formwork and find out what factors can affect labor productivity. This research was conducted using the time study method to calculate labor productivity. The time study method is a method of measuring labor productivity in the field by determining the standard time of a job. Collecting data in the field by making direct observations at the project site. Observations were made to obtain the volume and time of each job. In the observations, the basic time value will be measured which will be processed into standard time, and used to calculate the productivity value. From the calculation results, the value of labor productivity for structural work on column formwork, beam formwork, and plate formwork is 9.67 m2/OH, 11.58 m2/OH, and 13.742. The productivity values for column reinforcement, beam reinforcement, and plate reinforcement are 472.10 kg/OH, 368.76 Kg/OH, 470.09Kg/OH, respectively. From the analysis of the factors that can affect productivity based on field conditions, there are two factors that can affect productivity in formwork and reinforcement work, namely the number of workers and weather factors.

Item Type: Thesis (Other)
Additional Information: RSS 331.118 Alf a-1 2022
Uncontrolled Keywords: Bekisting dan Penulangan, Produktivitas, Time Study, Tenaga Kerja, Formwork and Reinforcement, Productivity, Labor
Subjects: T Technology > T Technology (General) > T58.8 Productivity. Efficiency
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Anis Wulandari
Date Deposited: 17 Apr 2023 04:27
Last Modified: 17 Apr 2023 04:27
URI: http://repository.its.ac.id/id/eprint/97874

Actions (login required)

View Item View Item