Penjadwalan Proyek Pengembangan Software Secara Dinamis Dan Multi Proyek Dengan Pendekatan Heuristik

Nurdewanto, Bambang (2006) Penjadwalan Proyek Pengembangan Software Secara Dinamis Dan Multi Proyek Dengan Pendekatan Heuristik. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 5102201011-Master_Thesis.pdf] Text
5102201011-Master_Thesis.pdf - Accepted Version

Download (14MB)

Abstract

Sebelum proyek pengembangan perangkat lunak biasanya dilakukan estimasi:berapa lama dibutuhkan waktu untuk mengerjakan proyek (schedule), berapa lama usaha (effort) yang diperlukan untuk mengerjakan proyek, dan berapa banyak orang (staff) akan dilibatkan dalam pengerjaan proyek. Oengan menggunakan metode COCOMO II suatu perangkat lunak dapat diestimasi kebutuhan effort dan schedule. Dengan diketahuinya effort dan schedule, maka dapat dibuat jadwal multi proyek untuk beberapa perangkat lunak yang sedang dikembangkan.Selama ini estimasi waktu dan penempatan sumber daya secara dinamis dan multi proyek sulit diperhitungkan. Oleh karena itu dicari solusi dengan pendekatan heuristik. Dengan membandingkan beberapa pendekatan heuristik akan dicari solusi yang paling optimal. Bila terdapat perubahan pada penjadwalan, maka semua aktivitas proyek akan dijadwalkan ulang dengan cepat.
=====================================================================================================================================
Before development project of software is generally done by estimated: how long a time to do proj~ct required; how long the effort that is needed to do project, and how many people would involved in a project workmanship. By using method COCOMO II, software can be estimated effort and schedule requirement. Known of effort and schedule, hence can be scheduled for multi project for a few the software which is being developed. During the time estimate resource location and time dynamic and multi project difficult to calculate. Therefore search solution by heuristic approach. Compared some approach heuristic will be searched the most optimal solution. When there are changed of schedlJling, hence all projoct activity will be rescheduled swiftly.

Item Type: Thesis (Masters)
Additional Information: RTIF 658.53 Nur p
Uncontrolled Keywords: effort, schedule, COCOMO, multi proyek, heuristik
Subjects: Q Science > QA Mathematics > QA76 Computer software
T Technology > T Technology (General) > T56.8 Project Management
Divisions: Faculty of Industrial Technology > Informatics Engineering > 55101-(S2) Master Thesis
Depositing User: Totok Setiawan
Date Deposited: 16 May 2023 06:10
Last Modified: 16 May 2023 06:10
URI: http://repository.its.ac.id/id/eprint/97922

Actions (login required)

View Item View Item