Studi Pola Arus Dan Sedimentasi Di Kolam Labuh PPI Panceng Gresik

Rismawati, Dyah (2007) Studi Pola Arus Dan Sedimentasi Di Kolam Labuh PPI Panceng Gresik. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 4302100002-Undergraduate_Thesis.pdf] Text
4302100002-Undergraduate_Thesis.pdf - Accepted Version

Download (8MB)

Abstract

Pada dermaga PPI (Pangkalan Pendaratan Ikan) kabupaten Gresik Ielah dibangun bangunan pelindung pantai berupa reklamasi untuk melindungi pelabuhan yang ada dari gelombang. Tetapi dengan adanya reklamasi tersebut, timbul masalah baru yaitu adanya sedimentasi di dalam kolam labuh PPI Panceng Gresik Hal ini mengganggu aktivitas yang ada, karena pendangkalan yang terjadi akan mempersulit proses bongkar muat barang. Untuk mengatasi sedimentasi di PPI Panceng Gresik maka dilakukan studi penggunaan sudetan di salah satu sisi daerah yang direklamasi. Karena dengan adanya sudetan ini, pola arus yang terjadi di kolam labuh menjadi lebih lancar dan volume sedimentasi yang terjadi di kolam labuh menjadi berkurang. Sudetan I memiliki ukuran panjang dan Iebar 50 x 4 m, sedangkan sudetan 2 memi/iki ukuran 50 x 6 m, sudetan 3 berukuran 35 x 4 m dan sudetan 4 berukuran 35 x 6 m. Pada kondisi awal volume sedimentasi yang terjadi pada kolam /abuh adalah I48 m3/minggu, sedangkan dengan adanya sudetan I, 2, 3 dan 4 volume sedimentasi di kolam labuh masing-masing berkurang menjadi 84 m3 /minggu, 91 m3 /minggu, 117 m3 /minggu dan 121 m3 /minggu
==================================================================================================================================
On Panceng-Gresik PPI (fisherman pier) a shore protection structure of reclamation has been built, a reclamation is used to protect the port from the incoming waves. When a reclamation built a new problem of sedimentation occurred on port basin of Panceng PPI The trivialization of port basin could hamper the process of loading and offloading. To control the sedimentation a study of usage of water cavity being done in one side of reclamation. After a water cavity being done the trace current on port basin flow smoothly and the sedimentation decrease.1st water cavity has length and width of 50 x 4 m, the 2nd water cavity is 50 x 6 m, the 3rd water cavity is 35 x 4 m and 41h water cavity is 35 x 6 m. The sedimentation in port basin on initial condition is 148 m3 /week. After the existence of water cavity the sedimentation volume decrease to 84 m3 /week, 91 m3/ week, 117 m3 / week and 121 m3 / week for each model of water cavity

Item Type: Thesis (Other)
Additional Information: RSKe 627.31 Ris s 2007
Uncontrolled Keywords: Sedimentasi, sudetan, Sedimentation, water cavity
Subjects: Q Science > QE Geology > QE571 Sedimentation and deposition. Sediment transport. Erosion.
Divisions: Faculty of Marine Technology (MARTECH) > Ocean Engineering > 38201-(S1) Undergraduate Thesis