Studi Koordinasi Proteksi Pada PT. Kaltim Daya Mandiri Akibat Ada Pengembangan Kelistrikan Tursina

Rafi, Muhammad Sultan Aqil (2023) Studi Koordinasi Proteksi Pada PT. Kaltim Daya Mandiri Akibat Ada Pengembangan Kelistrikan Tursina. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 07111940000218_Non_Degree.pdf] Text
07111940000218_Non_Degree.pdf - Accepted Version
Restricted to Repository staff only until 1 September 2025.

Download (3MB) | Request a copy

Abstract

PT. Kaltim Daya Mandiri (KDM) merupakan salah satu perusahaan utilitas dan energi yang didirikan dengan tujuan untuk menyediakan kebutuhan utilitas pada fasilitas produksi dan perumahan PT. Pupuk Kaltim serta perusahaan – perusahaan lain yang berada di lingkungan Kaltim Industrial Estate. PT. Kaltim Daya Mandiri ini pastinya memiliki sistem kelistrikan dengan berbagai macam rele proteksi sebagai pengamanan ketika terjadi gangguan kelistrikan. Seiring dengan perkembangan zaman, PT. KDM sedang merencanakan pengembangan sistem kelistrikan pada Tursina. Tursina sendiri merupakan salah satu area pabrik dan pelabuhan di PT. Pupuk Kaltim yang berada di Bontang. Berdasarkan hal tersebut maka harus dilakukan studi terkait koordinasi proteksi pada PT. KDM melalui power system analysis study demi menjaga keandalan sistem proteksinya akibat adanya pengembangan ini. Pada tugas akhir ini, dilakukan analisis kinerja sistem proteksi koordinasi rele arus lebih gangguan fasa dan gangguan tanah serta setting pengamanan pada rele proteksi akibat adanya pengembangan kelistrikan Tursina untuk menjadi pengaman ketika terjadi gangguan pada sistem kelistrikan. Hasil evaluasi ini nantinya akan menjadi rekomendasi bagi perusahaan dalam melindungi sistem kelistrikan dengan tepat dan handal.
==================================================================================================================================
PT. Kaltim Daya Mandiri (KDM) is a utility and energy company established with the aim of providing utilities for PT. Pupuk Kaltim and other companies within the Kaltim
Industrial Estate. PT. Kaltim Daya Mandiri certainly has an electrical system with various kinds of protection relays as security when there is an electrical disturbance. Along with the times, PT. KDM is planning to develop an electrical system for Tursina. Tursina itself is one of the factory and port areas at PT. Pupuk Kaltim located in Bontang. Based on this, a study related to protection coordination at PT. KDM went through a power system analysis study in order to
maintain the reliability of its protection system as a result of this development. In this final project, an analysis of the performance of the coordination protection system of the existing relay overcurrent phase faults and ground faults is also carried out as well as the safety settings for the protection relay due to the development of the Tursina electricity system to act as a safeguard when there is a disturbance in the electrical system. The results of this evaluation will later become recommendations for companies in protecting the electrical system properly and
reliably

Item Type: Thesis (Other)
Uncontrolled Keywords: Rele Proteksi, Koordinasi Proteksi, Keandalan, Power System analysis, Power System, Protection Relay, Protection Coordination, Reliability
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1001 Production of electric energy or power
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1322.6 Electric power-plants
Divisions: Faculty of Electrical Technology > Electrical Engineering > 20201-(S1) Undergraduate Thesis
Depositing User: Muhammad Sultan Aqil Rafi
Date Deposited: 20 Jul 2023 07:20
Last Modified: 20 Jul 2023 07:20
URI: http://repository.its.ac.id/id/eprint/98713

Actions (login required)

View Item View Item