Abstract

Stabilitas adalah kemampuan untuk kembali ke kondisi normal setelah terjadi gangguan. Transmisi High Voltage Direct Current (HVDC) dapat menyelesaikan masalah stabilitas tegangan yang terjadi pada sistem ac, menurunkan arus gagal, dan meningkatkan cadangan daya listrik. Time Domain Simulation (TDS) merupakan salah satu metode yang populer untuk menghitung Critical Clearing Time (CCT). Untuk menghitung load flow sensitivity, menggunakan perintah analisis load flow sensitivity pada Powerfactory 15.1. Variabel yang dipertimbangkan dalam penelitian ini adalah dφ/dP. Penelitian ini mengenai perubahan nilai CCT pada sistem transmisis AC/DC yang paling optimal berdasarkan metode sensitivity analysis. Dengan mengambil beberapa sampel dari saluran yang memiliki nilai sensitivitas tinggi yaitu saluran 8—9 sampai 7—8 dengan rata-rata nilai perubahan cct 0.555 s, nilai sedang yaitu saluran 5—8 sampai 9—6 memiliki rata-rata perubahan cct 0.234 s, dan rendah dari saluran 6—4 sampai 9—4 dengan rata-rata perubahan 0.109 s. Data di atas menunjukkan bahwa saluran dengan nilai sensitivitas yang besar akan memberikan peningkatan nilai cct yang lebih tinggi dibandingkan dengan yang memiliki nilai sensitivitas rendah jika dipasangkan dengan saluran HVDC.
================================================================================================================================
Stability is the ability to return to normal conditions after a disturbance. High Voltage Direct Current (HVDC) transmission can solve voltage stability problems that occur in ac systems, reduce the failure current, and increase the reserve of electric power. Time Domain Simulation (TDS) is a popular method for calculating Critical Clearing Time (CCT). To calculate load flow sensitivity, use the load flow sensitivity analysis command in Powerfactory 15.1. The variable considered in this research is dφ/dP. This research is concerned with increase the CCT value in the most optimal AC/DC transmission system based on the sensitivity analysis method. By taking several samples that have high sensitivity values, namely channels 8-9 to 7-8 with an average cct change value of 0.555 s, medium values, channels 5-8 to 9-6 have an average cct change of 0.234 s, and low from channels 6-4 to 9-4 with an average change of 0.109 s. The data above shows that a channel with a large sensitivity value will provide a higher increase in cct value compared with a low sensitivity value when paired with an HVDC.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Transient Stability, High Voltage Direct Current, Critical Clearing Time (CCT), Sensitivity Analysis
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1010 Electric power system stability. Electric filters, Passive.
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK3226 Transients (Electricity). Electric power systems. Harmonics (Electric waves).
Divisions: Faculty of Intelligent Electrical and Informatics Technology (ELECTICS) > Electrical Engineering > 20101-(S2) Master Thesis
Depositing User: I Gede Dyotha Yogadipha Bagas
Date Deposited: 22 Jul 2023 07:32
Last Modified: 22 Jul 2023 07:32
URI: http://repository.its.ac.id/id/eprint/98895

Actions (login required)

View Item View Item