Analisis Penjadwalan Probabilistik pada Proyek Apartemen Grand Shamaya Tower Aubrey

Kendek, Atania Thyra Mirable (2023) Analisis Penjadwalan Probabilistik pada Proyek Apartemen Grand Shamaya Tower Aubrey. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111940000007-Undergraduate_Thesis.pdf] Text
03111940000007-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2025.

Download (22MB) | Request a copy

Abstract

Industri konstruksi di Indonesia kembali mengalami pertumbuhan dan mencapai 7,2% di tahun 2022. Kualitas suatu proyek konstruksi dipengaruhi oleh perencanaan yang memuat tiga parameter penting, yaitu biaya, waktu, dan mutu. Dengan demikian, penjadwalan merupakan salah satu aspek penting yang perlu direncanakan, terlebih bagi proyek yang memiliki bobot pekerjaan yang besar. Penjadwalan proyek umumnya dibuat secara deterministik, yaitu dengan prediksi durasi yang tepat. Namun, faktanya suatu proyek konstruksi pasti memiliki risiko yang muncul akibat ketidakpastian karena sifat sebuat proyek yang unik, dinamis, dan cenderung kompleks. Oleh karena itu, penjadwalan suatu proyek konstruksi harus direncanakan dengan memperhitungkan ketidakpastian melalui penjadwalan probabilistik. Pada penelitian ini, dilakukan analisis penjadwalan probabilistik pada Proyek Pembangunan Apartemen Grand Shamaya Tower Aubrey yang didasarkan pada 3 (tiga) parameter durasi, yaitu durasi optimis, most likely, dan pesimis menggunakan metode Program Evaluation Review Technique (PERT) dan simulasi Monte Carlo. Penelitian ini didasarkan oleh historical info dari expert dalam memberikan estimasi durasi masing-masing pekerjaan. Data tersebut kemudian akan diolah untuk memperoleh total durasi probabilistik penyelesaian proyek, persentase probabilitas penyelesaian proyek, dan mengidentifikasi aktivitas yang paling sering berada pada lintasan kritis. Berdasarkan penelitian yang telah dilakukan pada pekerjaan struktur Tower Aubrey Apartemen Grand Shamaya, didapatkan durasi dengan rentang probabilitas 1% sampai 100% adalah 293 sampai dengan 327 hari, dimana durasi rata-rata (mean) dengan probabilitas penyelesaian 50% adalah 304 hari. Kemudian, durasi rencana proyek yang dibuat secara deterministik memiliki tingkat probabilitas penyelesaian sebesar 97,93% menggunakan metode PERT dan 99,85% menggunakan simulasi Monte Carlo. Hal ini berarti durasi rencana proyek masuk dalam rentang probabilitas penyelesaian. Adapun aktivitas yang selalu berada pada lintasan kritis dari hasil simulasi adalah pekerjaan pembesian, bekisting, dan pengecoran balok dan kolom pada Zona 2 serta aktivitas yang memiliki sensitivitas tertinggi ada pada pekerjaan lantai 37 sampai dengan lantai 39.
===================================================================================================================================
The construction industry in Indonesia has regrown up and it will reach 7.2% in 2022. The construction project quality is indicated by a good planning including three important parameters namely cost, time, and quality. Therefore, project scheduling is an important aspect that needs to be planned, especially for complicated projects. Project scheduling often uses deterministic scheduling, which based on one time scheduling. However, there are some uncertainties due to the nature of a project that is unique, dynamic, and tends to be complex. Therefore, probabilistic scheduling is needed to cover those uncertainties. In this study, a probabilistic scheduling analysis was carried out in the Grand Shamaya Tower Aubrey Apartment Development Project based on 3 (three) duration parameters, namely optimistic, most likely, and pessimistic duration using the Program Evaluation Review Technique (PERT) method and Monte Carlo simulation. This research was based on historical info from project experts to estimate the duration of each activity. The collected data were then be analyzed to obtain probabilistic completion projects for the total duration, the proportion of project completion possibilities from the scheduling plan, and identify frequent critical activities. Based on the research conducted on the structural work of the Aubrey Tower Grand Shamaya Apartment, the duration range with a probability of 1% to 100% is from 293 to 327 days, where the average duration (mean) with a 50% completion probability is 304 days. Furthermore, the project's deterministic schedule has a completion probability of 97,93% using the PERT method and 99,85% using the Monte Carlo Simulation. This indicates that the project's planned duration falls within the range of completion probabilities. The activities that consistently appear on the critical path from the simulation results are reinforcing, formwork, and casting of beams and columns in Zone 2. Additionally, the activities with the highest sensitivity are found in the construction of floors 37 to 39.

Item Type: Thesis (Other)
Uncontrolled Keywords: Durasi, Penjadwalan, PERT, Probabilistik, Simulasi Monte Carlo, Duration, Monte Carlo Simulation, Probabilistic, Scheduling
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD69.T54 Time management. Scheduling
T Technology > T Technology (General) > T56.8 Project Management
T Technology > T Technology (General) > T57.62 Simulation
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Atania Thyra Mirable Kendek
Date Deposited: 29 Jul 2023 13:33
Last Modified: 29 Jul 2023 13:33
URI: http://repository.its.ac.id/id/eprint/99867