PEMODELAN KERJASAMA SUBKONTRAKTOR - KONTRAKTOR DENGAN PENDEKATAN FUZZY GAME THEORY

HARDIAN DWI SUSANTO, HARDIAN DWI (2016) PEMODELAN KERJASAMA SUBKONTRAKTOR - KONTRAKTOR DENGAN PENDEKATAN FUZZY GAME THEORY. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3113203003-Master_Theses.pdf]
Preview
Text
3113203003-Master_Theses.pdf - Published Version

Download (3MB) | Preview

Abstract

Tak dipungkiri dewasa ini di era persaingan global internasional maupun
nasional dan tantangan percepatan pembangunan, kedepannya akan banyak
pekerjaan skala besar proyek – proyek konstruksi yang berkembang pesat di
Surabaya. Proyek besar tersebut memerlukan biaya dan sumber daya besar serta
melibatkan banyak pihak yang terlibat. Keberhasilan dan kebersinambungan proyek
yang dikerjakan oleh kontraktor pada industri konstruksi tak terlepas dari keterkaitan
kemitraan yang saling menguntungkan (win – win) antar pihak yang terlibat pada
rantai pasok proyek, salah satunya adalah subkontraktor.
Penelitian ini memodelkan kerjasama kontraktor – subkontraktor untuk
subpekerjaan tiang pancang dengan metode Fuzzy Game theory. Metode Game
theory digunakan sebagai dasar penyusunan strategi kerjasama kooperatif antara
kontraktor dan subkontraktor, sedangkan Fuzzy logic digunakan untuk perhitungan
nilai payoff. Ada dua strategi yang digunakan dalam teori permainan ini, yaitu:
strategi Harga (diskon) dan ketersediaan produk (stok). Proyek Puncak Darmahusada
digunakan sebagai studi kasus.
Hasil penelitian menunjukkan bahwa model yang diusulkan dapat digunakan
sebagai model kerjasama yang seimbang (win-win solution) antara kontraktor –
subkontraktor dimana para pemain mendapatkan benefit yang paling optimal dari
strateginya. Dalam simulasi kedua belah pihak akan memperoleh keuntungan yang
paling optimal dengan payoff sebesar Rp164.926.010,-; Rp62.839.808,- dengan
strategi harga (diskon) sebesar 1,51% dan ketersediaan stok nilai sebesar 30% ========== In appropiate in current era of global competition and the challenge of
international and national development acceleration, the future will be a lot of work
large-scale projects - construction projects are growing rapidly in Surabaya. The
large projects require substantial costs and resources and involve many parties are
involved. The success and sustainability of projects undertaken by contractors in the
construction industry can not be separated from a partnership relationship mutually
beneficial (win - win) between the parties involved in the project supply chain, one
of which is a subcontractor.
This research of modeling the contractors with subcontractors in cooperation
for procurement pile with Fuzzy Game theory. Game theory methods are used as the
basis for cooperative cooperation strategy between the contractor and subcontractors,
while fuzzy logic is used for calculating the value of a payoff. There are two
strategies used in Game Theory, namely: strategy price (discount) and product
availability (stock). Puncak Darmahusada project used as a case study.
The results showed that the proposed model can be used as a balanced model
of cooperation (win-win) between the contractor and subcontractor where the players
get the most benefit from the optimal strategy. In the simulation of both parties
would benefit most optimal payoff for Rp164.926.010,- ; Rp62.839.808,- with a
strategy price (discount) is 1,51% and the product availability (stock) is 30%

Item Type: Thesis (Masters)
Uncontrolled Keywords: Kemitraan, Kontraktor, subkontraktor, fuzzy, Game Theory, partnership, contractors, subcontractors, fuzzy, game theory
Subjects: Q Science > QA Mathematics > QA269 Game theory
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22101-(S2) Master Thesis
Depositing User: - Davi Wah
Date Deposited: 05 Jan 2017 04:50
Last Modified: 26 Dec 2018 08:32
URI: http://repository.its.ac.id/id/eprint/1329

Actions (login required)

View Item View Item