Analisis Kinerja Pelayanan Pintu Tol Gempol - Pasuruan

Pranata, Rezalvi Indra (2017) Analisis Kinerja Pelayanan Pintu Tol Gempol - Pasuruan. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3113100123-Undergraduate-Theses.pdf]
Preview
Text
3113100123-Undergraduate-Theses.pdf - Published Version

Download (3MB) | Preview

Abstract

Jawa Timur merupakan provinsi yang memiliki populasi penduduk sekitar 37,47 juta jiwa.Hal ini berimbas kepada meningkatnya kebutuhan untuk melakukan perjalanan dari tempat awal menuju ke tempat tujuan. Jalan merupakan prasarana yang mendukung hal tersebut. Menurut data Dinas PU Bina Marga, tahun 2012, rasio panjang jalan terhadap jumlah kendaraan di Jawa Timur tercatat 3,29 km untuk setiap 1000 kendaraan bermotor. Hal ini disebabkan pertumbuhan jumlah kendaraan bermotor yang lebih cepat dibandingkan dengan pertumbuhan panjang jalan yang ada..
Jalan tol merupakan salah satu jenis jalan yang dipergunakan untuk mempercepat laju perpindahan tersebut. Kualitas yang baik dari jalan tol memberikan jaminan terhadap kecepatan distribusi barang dan jasa. Tetapi kenyataannya, jalan tol tidak dapat menjamin penuh akan hal tersebut karena salah satu faktor tersebut adalah waktu dan kualitas pelayanan di pintu tol. Banyak pintu tol yang tidak mencukupi dari segi kinerja maupun pelayanan. Padahal, pintu tol sangat penting untuk diperhatikan, karena akan mempengaruhi jumlah kendaraan yang akan masuk ke gerbang tol yang lain. Selain itu, kualitas dari pelayanan yang diberikan akan memberikan dampak yang signifikan terhadap jumlah laju kendaraan yang dapat dilayani. Dalam tugas akhir ini membahas antrian yang terjadi pada gerbang tol yang ada. Antrian adalah suatu garis tunggu dari nasabah (satuan) yang memerlukan layanan dari satu atau lebih pelayanan (fasilitas layanan). Teori antrian itu sendiri adalah studi secara matematis dari kejadian atau gejala garis tunggu. Selain itu, antrian dijadikan alat analitis yang akan memberikan informasi efektif mengenai suatu permasalahan, bukan suatu teknik optimasi.
Hasil penelitian ini menunjukan bahwa pada tahun awal, jumlah gardu yang telah ada dapat melayani kendaraan yang melewati . Sedangkan untuk volume kendaraan sesuai umur rencana jalan (30 tahun) memerlukan penambahan jumlah gardu . Untuk gerbang I Bangil dilakukan perubahan semula untuk arah masuk terdapat 3 gardu (1 GTO single dan 2 GTO multi) menjadi 2 gardu (1 GTO multi dan OBU), untuk arah keluar semula 2 gardu yang beroperasi (1 GTO single dan 1 manual) menjadi 3 gardu (1 GTO multi, 1 OBU dan 1 manual).Untuk gerbang II Rembang tidak dilakukan perubahan dikarenakan konfigurasi yang sudah ada cukup melayani kendaraan yang ada. Untuk gerbang III Pasuruan dilakukan perubahan semula untuk arah masuk terdapat 3 gardu (1 GTO single dan 2 GTO multi) menjadi 3 gardu (1 GTO multi,1 OBU dan 1 manual), untuk arah keluar semula 2 gardu yang beroperasi (1 GTO single dan 1 manual) menjadi 3 gardu (1 GTO multi, 1 OBU dan 1 manual). Untuk Gerbang IV dari semula terdapat 8 gardu (7 GTO ; 1 manual) menjadi 4 gardu (4 OBU)

========================================================================================

East Java is a province which has a population of about
37,47 million. It is promoted to the increased need to travel from
the place of the beginning of the heading to the destination. The
road is the infrastructure that supports it. According to data of the
Department of PU Bina Marga, in 2012, the ratio of the length of
the road towards the number of vehicles in East Java recorded 3.29
km for every 1000 vehicles. This is due to the growth in the number
of motor vehicles that is faster than the growth in length of the
existing road.
The highway is one of the types of roads used to speed up the
transfer. Good quality of highways providing security against the
speed of the distribution of goods and services. But in fact, the
highway does not guarantee the full will of the matter because one
of these factors is the time and quality of service at the toll booth.
Many of the toll booth which is insufficient in terms of performance
or service. In fact, the toll booth is very important to note, because
it will affect the number of vehicles that will go into another toll
gate. In addition, the quality of the service provided will give a
significant impact against the amount of the rate of vehicles that
can be served.
In this final project discusses the queues that occur at the
toll gates. The queue is a waiting line of the customer (unit) that
require the services of one or more services (facilities services).
Queuing theory itself is the study of mathematically from the
waiting line of symptoms or events. In addition, the Foundation of analytical tools that queues will provide effective information
about a problem, not an optimization technique.
The results of this study showed that in the beginning, the
number of booths that may serve the vehicles that pass through. As
for the volume of the corresponding vehicle age road plan (30
years) require the addition of a number of booths. For the gate I
Bangil done again to change the direction of the entrance there are
3 booths (1 single and 2 GTO GTO multi) into 2 substation (1 GTO
multi and OBU), to the direction of the original Exit 2 substation
operating (1 single and 1 manual GTO) into 3 booths (1 GTO 1
multi OBU and 1 manual). For the Gate II Rembang was not done
because of changes to the existing configuration simply serve the
existing vehicles. For gate III Pasuruan is done again to change
the direction of the entrance there are 3 booths (1 single and 2
GTO GTO multi) into 3 booths (1 GTO multi, 1 manual and 1
OBU), to the direction of the original Exit 2 substation operating
(1 single and 1 manual GTO) into 3 booths (1 GTO 1 multi OBU
and 1 manual). To Gate IV from the beginning there are 8 booths
(7 GTO; 1 manual) into 4 booth (4 OBU)

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Jalan Tol; Pintu Tol Gempol-Pasuruan; Kinerja Pelayanan Pintu Tol; toll booth toll road; Gempol-Pasuruan toll booth Services; performance
Subjects: T Technology > TE Highway engineering. Roads and pavements > TE7 Transportation--Planning
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: REZALVI INDRA PRANATA
Date Deposited: 10 Mar 2017 03:10
Last Modified: 06 Mar 2019 07:28
URI: http://repository.its.ac.id/id/eprint/3278

Actions (login required)

View Item View Item