Optimasi Proyek Pembuatan Kapal Patroli Cepat(Fast Patrol Boat) 38 M Aluminium Dengan Metode PERT/CPM

Zuchria, Machmuda Nuril (2017) Optimasi Proyek Pembuatan Kapal Patroli Cepat(Fast Patrol Boat) 38 M Aluminium Dengan Metode PERT/CPM. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img] Text
1211100057-Undergraduated Thesis.pdf - Published Version
Restricted to Repository staff only

Download (2MB) | Request a copy

Abstract

Proyek pembuatan kapal adalah suatu proyek yang kompleks dimana terdapat banyak kegiatan dalam prosesnya dan memerlukan biaya yang besar sehingga diperlukan manajemen proyek yang efektif berkaitan dengan waktu dan biaya agar tidak terjadi keterlambatan dan pembengkakan biaya dalam proses penyelesaiannya. Tugas akhir ini membahas teknik penjadwalan waktu pengerjaan dan biaya yang diperlukan dalam pembuatan Kapal Patroli Cepat 38 M Aluminium. Untuk mengatasi masalah keterlambatan diperlukan percepatan proyek. Percepatan proyek diselesaikan dengan metode PERT dan CPM yaitu crash program dengan melakukan penambahan biaya per satuan waktu pada lintasan kritisnya sehingga diperoleh waktu pelaksanaan yang efisien serta biaya yang dikeluarkan optimal. Dari hasil percepatan proyek dengan penambahan 1 jam kerja lembur diperoleh waktu penyelesaian proyek sebesar 387 hari dengan biaya percepatan USD 12,876,459. Sedangkan dengan penambahan 3 jam kerja lembur penyelesaian proyek menjadi 371 hari dengan biaya proyek sebesar USD 12,889,500. =============================================================================================== Shipbuilding project is a complex project where there are many activities in the process and require huge cost that required efective project management related to the time and cost to avoid the delays and cost overruns in the process of completion. This final project discusses scheduling techniques processing time and cost required in the manufacture of Fast Patrol Boat 38 M Aluminum. To overcome the problem of delay required acceleration of the project. Acceleration of the project is completed by PERT and CPM methods that is crash program by adding the cost per unit time on the critical path in order to obtain an efficient implementation time and optimal cost. From the result of the acceleration of the project with the addition of 1 hour overtime earned by the project completion time 387 days and project cost USD 12,876,459. While the addition of 3 hours overtime completion of the project be 371 days with project cost USD 12,889,500.

Item Type: Thesis (Undergraduate)
Additional Information: RSMa 658.403 519 6 Zuc o
Uncontrolled Keywords: Kapal, PERT, CPM, Crashing Program, Cost Slope
Subjects: V Naval Science > V Naval Science (General)
V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering
Divisions: Faculty of Mathematics and Science > Mathematics > 44201-(S1) Undergraduate Thesis
Depositing User: Mr. Tondo Indra Nyata
Date Deposited: 09 Aug 2017 04:30
Last Modified: 18 Dec 2017 03:03
URI: https://repository.its.ac.id/id/eprint/48300