Studi Kelayakan Teknis Penerapan Teknologi Pembangkit Listrik Tenaga Gelombang Laut Sistem Bandul (PLTGL-SB) Di Daerah Pesisir Pulau Bawean Gresik

Kamesworo, Windy (2016) Studi Kelayakan Teknis Penerapan Teknologi Pembangkit Listrik Tenaga Gelombang Laut Sistem Bandul (PLTGL-SB) Di Daerah Pesisir Pulau Bawean Gresik. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 4211100044-Undergraduate-Theses.pdf]
Preview
Text
4211100044-Undergraduate-Theses.pdf - Published Version

Download (1MB) | Preview

Abstract

Menurut data dari PLN, di Pulau bawean tercatat sekitar 2.750
rumah tangga yang belum teraliri listrik maupun yang masih
tercatat di daftar tunggu calon pelanggan dan juga sumber listrik
disana masih menggunakan PLTD. Berdasarkan BMKG Stasiun
Meteorologi Maritim Perak II Surabaya di peisisir Pulau Bawean
memiliki tinggi gelombang signifikan berkisar antara 0,1 – 3 m
yang berpotensi untuk dimanfaatkan sebagai Pembangkit Listrik
Tenaga Gelombang Laut (PLTGL). Salah satunya adalah
Pembangkit Listrik Tenaga Gelombang Laut–Sistem Bandul
(PLTGL-SB). Dengan tinggi gelombang dan periode gelombang
signifikan yang terjadi, besar daya listrik maksimal yang mampu
dihasilkan adalah sebesar 9658,54 watt atau 9,66 kW. Daya
maksimal terjadi pada bulan Desember. PLTGL-SB model tripod
ini mampu menyuplai kebutuhan listrik di daerah sasaran
sebanyak 7 unit rumah. Namun pada bulan Desember, mampu
menyuplai kebutuhan listrik sebanyak 42 unit rumah. PLTGL-SB
ini tidak layak untuk dijadikan pembangkit listrik yang mampu
bekerja secara kontinyu. Namun layak diterapkan sebagai sumber energi cadangan dari PLN.

=================================================================

According to data from the PLN, on the island of Bawean
carrying about 2,750 households not electrify yet and still in the
waiting list of prospective customers and also still using diesel
engine power plant. According to BMKG Perak Maritime
Meteorology Station II Surabaya in Bawean Island coastal area
has significant wave height range from 0.1 to 3 m which is
potential to be used as a Sea Wave Power Plants (PLTGL). One
of them is the Sea Wave Power Plant - Pendulum System
(PLTGL-SB). With the wave height and significant wave periode
occurs on the island of Bawean, maximum generating electric
power is 9658.546 watts or 9.66 kW. Maximum power occurs in
December. PLTGL-SB tripod model applied in the northern area
of the Bawean island is able to supply the electrical needs in the
target area of 7 houses. But in December, is able to supply the
electricity needs in the target area as much as 42 units. PLTGLSB
as a power plant, is not suitable to work continuously.
However it is feasible as a backup energy source of PLN.

Item Type: Thesis (Undergraduate)
Additional Information: RSSP 627.32 Kam s
Uncontrolled Keywords: Pulau Bawean, PLTGL-SB, Gelombang Laut, Pembangkit Listrik, Daya Listrik, Bawean Island, Sea Wave, Power, Electricity
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK201 Electric Power Transmission
T Technology > TC Hydraulic engineering. Ocean engineering
Divisions: Faculty of Marine Technology (MARTECH) > Marine Engineering > 36202-(S1) Undergraduate Thesis
Depositing User: Anis Wulandari
Date Deposited: 03 Oct 2017 07:37
Last Modified: 03 Oct 2017 07:37
URI: http://repository.its.ac.id/id/eprint/48907

Actions (login required)

View Item View Item