Analisa investasi perencanaan awal transport gas alam dari Kalimantan Timur ke Jawa Tengah dengan moda pipa bawah laut

Rusdiono, Hanif Arif (2006) Analisa investasi perencanaan awal transport gas alam dari Kalimantan Timur ke Jawa Tengah dengan moda pipa bawah laut. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 4310100027-Undergraduate_Theses.pdf]
Preview
Text
4310100027-Undergraduate_Theses.pdf - Published Version

Download (16MB) | Preview

Abstract

Ketersediaan gas alam sangat penting bagi pemulihan kondisi industri di Pulau Jawa. Oleh karena itu pemerintah berencana untuk menyalurankan gas alam dari Kalimantan Timur ke Pulau Jawa. Namun rencana pembangunan pipa transmisi gas Kalimantan Timur-Jawa Tengah hingga tahun 2004 masih dalam tahap studi kelayakaa Sehingga perlu dilakukan analisa ekonomis mengenai rencana proyek tersebut. Sebelum melakukan analisa ekonomis (analisa investasi), diperlukan perencanaan awal. Dalam penelitian ini ada beberapa konfigurasi skenano analisa. Konfigurasi itu meliputi konfigurasi besar gas flow rate, konfigurasi penggunaan kompresor,dan pemakaian over-under cost estimate. Perancangan ini menggunakan bantuan software GasCalc untuk menentukan besar mside diameter. Standart (codes) desain yang digunakan yakni ASME B31.8. Sedangkan untuk penentuan properties pipa yang ada di pasaran, standart yang digunakan yakni API 5L specification for line pipe. Setelah melakukan perhitungan dengan asumsi dan batasan masalah yang ada. maka akhirnya dapat di simpulkan bahwa proyek dengan menggunakan satu kompresor, gas flow rate sebesar 1100 MMSCFD.dan kondisi perokonomian yang baik (high GDP dan under cost estimate), merupakan konfigurasi terbaik. Karena dengan konfigurasi itu, terciptalah NPV yang terbesar yakni US $ 863.02 million, payback period yakni 6.09 tahun, dan arus kas proyek sebesar US $ 4143.69 million Sedangkan capital expenditure (CAPEX) proyek tersebut yakni sebesar US $ 2449.53 million dan operating expenditure (OPEX) US S 1815.27 million.
=============================================================================================
Gas supply is important needed for repaired the industrial condition on Java Island. Because this reason, government has planning to distributed natural gas from East Kalimantan to Java Island. Until two year ago, this plan still on feasibility study. So, the project must be economic analysis. Before take an economic analysis, the preliminary design must be prepared. This research has any analysis configuration or scenario. This configuration include gas flow rate configuration, compressor configuration, and over-under cost estimation. The design used software GasCalc helped for finding inside diameter. Design using the ASME B31.8 codes. Pipe properties taken front API 5 L specification for line pipe. After make a calculated based on assumed and problem limited, at least taken a conclusion with a compressor, gas flow rate is 1100 MMSCFD. economic condition on a high GDP and under estimate cost is the best configuration choosing. Because with this configuration, can take higher NPV. Value of NPV is LIS $ 863.02 million, payback period is 6.09 years, and project cash flow is US $ 4143.69 million. And then value of capital expenditure (CAPEX) tor this project is US $ 2449.53 million and operating expenditure (OPEX) US $ 1815.27 million.

Item Type: Thesis (Undergraduate)
Additional Information: RSKe 665.744 Rus a
Uncontrolled Keywords: NPV, payback period, gas flow rate, compressor, cost estimate
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering
Divisions: Faculty of Marine Technology (MARTECH) > Ocean Engineering > 38201-(S1) Undergraduate Thesis
Depositing User: Eny Widiastuti -
Date Deposited: 12 Mar 2018 02:30
Last Modified: 12 Mar 2018 02:30
URI: http://repository.its.ac.id/id/eprint/51508

Actions (login required)

View Item View Item