Sistem proteksi sangat dibutuhkan untuk menjaga kontinuitas dan meningkatkan keandalan dalam suatu sistem kelistrikan. Hal ini dikarenakan konsumsi energi listrik oleh beban beban industri berlangsung secara terus menerus. Untuk menjamin keandalan dan kontinuitas tersebut diperlukan pengaman pengaman tenaga listrik. PT. Linde Indonesia, Cilegon, merupakan anggota dari Grup Linde, yang memasok gas industri jangka panjang untuk PT. Krakatau Posco, dimana sangat memerlukan pengamanan dari gangguan gangguan yang paling sering terjadi yaitu gangguan hubung singkat antar fasa dan satu fasa ke tanah. Melalui tugas akhir ini dilakukan studi koordinasi proteksi pada PT. Linde Indonesia, Cilegon yang tepat dalam mendeteksi dan mengatasi gangguan sehingga tidak mengganggu sistem dan mencegah kerusakan yang mungkin terjadi pada peralatan listrik. Dari hasil kurva arus kondisi eksisting di dapatkan kesalahan kesalahan pada koordinasi yang ada pada rele arus lebih, dan ground fault, baik itu kesalahan pada setting pick up arus lebih dan juga kesalahan pada time delay yang ada dimana tidak sesuai dengan standar IEEE 242 grading time yaitu 0.2 – 0.4. Dan juga terdapat beberapa kesalahan pada setting rele diferensial baik itu minimum setting dan %Slope yang ada. Berdasarkan kesalahan kesalahan tersebut maka perlu dilakukan setting ulang pada rele yang ada sehingga setting an tersebut sesuai dengan standar yang ada dan dapat bekerja dengan aman dan secepat mungkin. ====================================================================================================== Protection system is needed to maintain continuity and improve the ability in electrical system. Protection is crucial because the consumption of electrical energy by industrial continues overtime. To guarantee the realibility and continuity of electrical power required protection system. PT Linde Indonesia, Cilegon, a member of The Linde Group, is the supplier of long term industrial gasses for PT. Krakatau Posco, which is required a protection from faults like short circuit phase to phase and phase to ground. Through this final project, protection coordination studies in PT. Linde Indonesia, Cilegon, will be doing a correction in order to detecting and isolating the fault that not disturbing the system and prevent damage to electrical equipment. The results of the current curves in exsisting condition, showed that some misscoordination protection in overcurrent relay, and ground fault. There are some misscoordination in pick up setting overcurrent and misscoordination in time delay which is not fit with IEEE 242 standart grading time ( 0.2s – 0.4s ). And besides there are some mistake of differential relay setting in minimum setting and %slope. Based on that misscoordination it is necessary to resetting the existing relay and can work safely and quickly as possible.

Item Type: Thesis (Undergraduate)
Additional Information: RSE 621.317 Dew s
Uncontrolled Keywords: Koordinasi proteksi, Rele arus lebih, Rele ground fault, Rele diferensial
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Faculty of Industrial Technology > Electrical Engineering > 20201-(S1) Undergraduate Thesis
Depositing User: Mr. Tondo Indra Nyata
Date Deposited: 03 Jul 2018 07:45
Last Modified: 03 Jul 2018 07:45
URI: https://repository.its.ac.id/id/eprint/52088

Actions (login required)

View Item View Item