Analisa Waktu dan Biaya Pelaksanaan Struktur Proyek Gedung MAN 1 Kota Malang

Yogananda, Nabilla and Kusuma, Algeria (2018) Analisa Waktu dan Biaya Pelaksanaan Struktur Proyek Gedung MAN 1 Kota Malang. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111500000012_10111500000014-Non_Degree.pdf]
Preview
Text
10111500000012_10111500000014-Non_Degree.pdf - Accepted Version

Download (26MB) | Preview

Abstract

Proyek Pembangunan MAN 1 Kota Malang ini dibangun 4 lantai dengan luas tanah 195 m2 dan luas bangunan 684,25 m2 yang terletak di Jalan Baiduri Bulan No.40, Tlogomas, Kec. lowokwaru, Kota Malang, Jawa Timur. dimana memerlukan perhitungan rencana anggaran biaya dan perhitungan waktu pelaksanaan untuk mengetahui seberapa besar biaya yang diperlukan dan berapa lama waktu untuk pelaksanaan proyek tersebut. Untuk analisa perhitungan tersebut dimulai dari menghitung durasi tiap pekerjaan berdasarkan perhitungan volume yang didapat dari gambar teknik yang ada. Setelah mendapat nilai durasi akan didapatkan nilai produktivitas tiap pekerjaan. Hasil perhitungan durasi tersebut dilanjutkan untuk penyusunan jadwal setiap pekerjaan yang dilakukan dengan menggunakan alat bantu Microsoft Project. Sedangkan analisa perhitungan rencana anggaran biaya pelaksanaan didapat dari durasi dan harga pekerjaan dimana standart harga yang digunakan adalah standart pada Kota Malang. Berdasarkan analisa perhitungan tersebut diperoleh rencana biaya pelaksanaan untuk pekerjaan struktur pada proyek ini sebesar Rp. 1.266.248.107 (Satu Milyar Dua ratus Enam Puluh Enam Juta Dua Ratus Empat Puluh Delapan Ribu Seratus Tujuh Rupiah) dengan waktu pelaksanaan pembangunan proyek selama 106 hari kerja.
========================================================================= Construction project MAN 1 Malang was built 4 floors with an area of 195 m2 and a building area 684,25 m2 which is located on Jl. Baiduri Bulan No.40, Tlogomas, Kec. Lowokwaru, Malang City, east Java. This project is requires the calculation of the budget and execution time to determine how much charge is required and how long it tooks for the implementation of the projeect. For the analysis of these calculation is starting from calculating the duration of each job based on the calculation of the volume of shopdrawing from the existing technique. after obtaining a duration value will get calculation of the duration of the schedule followed for the preparation of any work performed by using the tools of Microsoft Project. While analysis of the calculation of the budget plan obtain from the implementation duration and price which the standard price used is standard in Malang. Based on the results of the analysis, the cost of implementation plans for structures in this project is Rp.1.266.248.107 (One Billion Two Hundred Sixty Six Million Two Hundred Forty Eight Thousand One Hundred and Seven Rupiah) with the timing of project development for 106 working days.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: rencana anggaran biaya pelaksanaan, waktu pelaksanaan
Subjects: T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: ALGERIA KUSUMA
Date Deposited: 24 Jun 2021 04:02
Last Modified: 24 Jun 2021 04:02
URI: http://repository.its.ac.id/id/eprint/54326

Actions (login required)

View Item View Item