Alternatif Perencanaan Perbaikan Tanah Dasar dan Perkuatan Dinding Pada Konstruksi Underpass Lori STA 30+658 (Studi Kasus Proyek Tol Gempol-Pasuruan)

Putra, Aditya Winahyo Eka (2018) Alternatif Perencanaan Perbaikan Tanah Dasar dan Perkuatan Dinding Pada Konstruksi Underpass Lori STA 30+658 (Studi Kasus Proyek Tol Gempol-Pasuruan). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
03111645000058-Undergraduate_theses.pdf - Accepted Version

Download (6MB) | Preview

Abstract

Proyek konstruksi tol Gempol-Pasuruan merupakan proyek jalan tol yang menghubungkan antara wilayah Gempol dan Pasuruan. Proyek yang akan ditinjau merupakan pembangunan seksi 3 yang menghubungkan Grati hingga Pasuruan. Pada sekitar lokasi proyek tol tersebut banyak ditemukan industri tebu. Adanya jalan untuk kereta industri tebu yang memotong timbunan jalan tol maka konstruksi underpass perlu dibangun agar kereta tebu dapat melintasi konstruksi timbunan jalan tol tanpa harus berjalan memutar. Permasalahan yang umumnya terjadi pada pembangunan kontruksi underpass adalah pemampatan tanah dasar akibat beban lateral dan tekanan tanah pada dinding underpass. Lamanya waktu pemampatan yang terjadi dan pemampatan yang besar merupakan permasalahan yang harus ditanggulangi agar konstruksi tidak mengalami kerusakan. Besarnya tekanan tanah terhadap konstruksi underpass yang berada didalam tanah juga perlu diperhitungkan sehingga diperlukan konstruksi perkuatan dinding untuk penahan tanah. Perkuatan untuk dinding penahan tanah akan digunakan dua alternatif, yaitu geotextile-wall dengan box tunnel dan reinforced-geogrid wall dengan bridge structure. Sedangkan untuk mengatasi masalah lamanya waktu pemampatan dan besar ii pemampatan yang terjadi maka akan digunakan metode perbaikan tanah dasar Pre-loading dan metode perbaikan tanah dasar menggunakan PVD (pre fabricated vertical drain). Hasil dari perencanaan dapat diketahui bahwa alternatif box tunnel dengan perbaikan tanah dasar menggunakan metode preloading dan pvd serta perkuatan dinding dengan metode geotextile-wall merupakan pilihan alternatif yang paling efisien dari segi biaya dan efisien dalam hal kebutuhan material. ================================================================== Construction project of Gempol-Pasuruan toll road is a toll road project that connecting between Gempol and Pasuruan area. The project that will be reviewed is the construction of section 3 that connects Grati to Pasuruan city. At about the project location mostly found the sugar cane industry. The existance of the sugar cane industrial path that cut the embankment of the toll road so the underpass construction needs to be built the the sugar cane industrial train can be able to cross the embankment without turning around. The general problem that occur in underpass construction are about the settlement cause by the lateral load and soil pressure on the underpass wall. The time length of settlement that happen and a big settlement are the problem that must be repaired in order to prevent construction from damaged.. the magnitude of soil pressure againts underpass construction that located in the ground need to be calculated so it required construction method of retaining wall for ground anchoring. Two alternatives will be use for retaining wall, geotextilewall with box tunnel and reinforced-geogrid wall with bridge structure. Otherwise, to overcome the problem about the time length of settlement and the magnitude of the settlement that iv happen it will be used ground improvement method with preloading and pre fabricated vertical drain (PVD). The result of the planning can be known that box tunnel alternative with preloading and pvd method for soil improvement as well as retaining wall with geotextile-wall method is the most efficient alternative option in terms of cost and the most efficient in terms of material needs.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Underpass , preloading , PVD , Geotextile , Reinforced-wall
Subjects: B Philosophy. Psychology. Religion > B Philosophy (General)
T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TA Engineering (General). Civil engineering (General) > TA749 Soil stabilization
T Technology > TA Engineering (General). Civil engineering (General) > TA775 Foundations.
Divisions: Faculty of Civil, Environmental, and Geo Engineering > Civil Engineering > 22201-(S1) Undergraduate Theses
Depositing User: Aditya Winahyo Eka putra
Date Deposited: 09 Jul 2021 10:35
Last Modified: 09 Jul 2021 10:35
URI: https://repository.its.ac.id/id/eprint/57256