Perbandingan Waktu dan Biaya Pelaksanaan Konstruksi Drainase Jalan Dengan Metode Pabrikasi Precast dan Cast In Situ Pada Kawasan Industri PT. Semen Indonesia di Tuban

Akbar, Dimas Mahardhika and Putro, Mochamad Yusuf Adi (2018) Perbandingan Waktu dan Biaya Pelaksanaan Konstruksi Drainase Jalan Dengan Metode Pabrikasi Precast dan Cast In Situ Pada Kawasan Industri PT. Semen Indonesia di Tuban. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111500000088-10111500000094-Non_Degree.pdf]
Preview
Text
10111500000088-10111500000094-Non_Degree.pdf - Accepted Version

Download (3MB) | Preview

Abstract

PT. Semen Indonesia di Tuban merupakan jalan akses khusus pabrik. Yang berfungsi sebagai jalan akses khusus untuk mobilisasi kendaraan dari pabrik menuju pelabuhan sepanjang 8 km. dengan kondisi geografis jalan akses melewati lembah dan bukit. Jalan akses ini memiliki drainase jalan yang kurang terawat. Sehingga menyebabkan genangan di jalan dan banjir yang dapat merusak aspal. Oleh karena itu pada tahun 2017 PT. Semen Indonesia di Tuban telah melakukan perencanaan konstruksi drainase. Namun, untuk pelaksanaan belum dilaksanakan. Maka perlu dikaji metode pelaksanaan yang paling efektif. Maka digunakan 2 metode pelaksanaan konstruksi yaitu: cast in situ dan pabrikasi precast.
Dari pembahasan tugas akhir ini, ada 2 metode yang dibandingkan yakni metode pabrikasi precast dan cast in situ tersebut. Analisis yang dilakukan meliputi analisa biaya, analisa waktu dan penjadwalan. Metode pabrikasi precast pelaksanaannya meliputi pemasangan precast dan metode cast in situ pelaksanaannya meliputi pengecoran di lokasi. Pada analisa ini akan dilakukan perbandingan metode pabrikasi precast dan cast in situ pada proyek konstruksi drainase jalan akses khusus kawasan industri dari analisis waktu dan biaya. Analisis biaya dengan outputnya nanti berupa RAB. dari Analisis waktu yang outputnya berupa Kurva S dan PDM dalam bentuk network diagram.
Adapun hasil analisa perbandingan metode pabrikasi precast lebih mahal dibanding cast in situ dari segi biaya. Dari segi waktu precast lebih cepat dibanding cast in situ. Dengan Kebutuhan waktu pelaksanaan 35 minggu/ 245 hari dengan biaya sebesar Rp.47.046.915.109 untuk pabrikasi precast, sedangkan cast in situ membutuhkan waktu pelaksanaan 47 minggu/ 329 hari dengan biaya sebesar Rp.41.770.809.826. sedangkan untuk selisih biaya cast in situ dan pabrikasi precast adalah Rp.5.276.105.282,44 dan selisih waktu pelaksanaan adalah 12 minggu/ 84 hari. Maka pelaksanaan pabrikasi precast sangat dimungkinkan untuk dilaksanakan sesuai dengan kondisi geografis lokasi studi.

Kata Kunci : Perbandingan, Pabrikasi Precast, Cast In Situ, Analisis Biaya, Analisis Waktu, Penjadwalan

===========================================================================================

PT. Cement Indonesia in Tuban has a factory-specific access road. Which serves as a special access road for the mobilization of vehicles from the factory to the port along the 8 km. with geographical conditions of access roads passing through valleys and hills. This access road has poorly maintained road drainage. Thus causing puddles in roads and floods that can damage asphalt. Therefore, in the year 2017 PT. Cement Indonesia in Tuban has been planning drainage construction. However, for implementation has not been implemented. It is necessary to examine the most effective method of implementation. Then used 2 methods of construction implementation are: cast in situ and precast fabrication.
From the discussion of this thesis, there are 2 methods that compared the method of manufacturing precast and cast in situ. The analysis includes cost analysis, time analysis and scheduling. Manufacturing precast fabrication methods include the installation of precast and cast in situ methods of execution including on-site casting. In this analysis, a comparison of precast and cast in situ manufacturing methods will be made in the construction of a special industrial road access road drainage from time and cost analysis. Cost analysis with output later in the form of RAB. from time analysis whose output is Curve S and PDM in network diagram form
The comparative analysis of precast fabrication method is more expensive than cast in situ in terms of cost. In terms of precast time is faster than cast in situ. With the requirement of 35 weeks / 245 days of implementation time at a cost of Rp.47.046.915.109 for manufacturing precast, while cast in situ takes 47 weeks / 329 days at a cost of Rp.41.770.809.826. while for the difference in cost of cast in situ and the manufacturing of precast is Rp.5.276.105.282,44 and the execution time difference is 12 weeks / 84 days. Thus the implementation of precast fabrication is possible to be carried out in accordance with the geographical conditions of the study site.

Keywords: Comparison, Precast Fabrication, Cast In Situ, Cost Analysis, Time Analysis, Scheduling

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Perbandingan, Pabrikasi Precast, Cast In Situ, Analisis Biaya, Analisis Waktu, Penjadwalan
Subjects: T Technology > T Technology (General) > T56.8 Project Management
T Technology > TA Engineering (General). Civil engineering (General) > TA683 Precast concrete construction. Prestressed concrete construction.
T Technology > TC Hydraulic engineering. Ocean engineering > TC167 Dams, reservoirs
Depositing User: Dimas Mahardhika Akbar
Date Deposited: 18 Jul 2021 23:25
Last Modified: 18 Jul 2021 23:25
URI: http://repository.its.ac.id/id/eprint/57434

Actions (login required)

View Item View Item