Alternatif Perencanaan Struktur Hotel Harvest Dengan Menggunakan Metode Beton Pracetak Pada Pelat Dan Balok Di Kota Batu Malang Jawa Timur

Hidayat, Taufiq (2018) Alternatif Perencanaan Struktur Hotel Harvest Dengan Menggunakan Metode Beton Pracetak Pada Pelat Dan Balok Di Kota Batu Malang Jawa Timur. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111410000056-Undergraduated_Theses.pdf]
Preview
Text
10111410000056-Undergraduated_Theses.pdf - Accepted Version

Download (40MB) | Preview

Abstract

Metode pracetak saat ini telah banyak digunakan dalam pembangunan konstruksi sipil. Hal ini terjadi karena beton pracetak memiliki beberapa kelebihan dibandingkan beton yang dicor di tempat (cast in situ). Kelebihannya antara lain yaitu proses pembuatannya yang tidak bergantung cuaca, tidak memerlukan banyak bekisting, waktu pengerjaan yang lebih singkat, biaya lebih murah, kontrol kualitas beton lebih terjamin serta menurut penelitian terbaru beton pracetak juga ramah lingkungan.
Tujuan dari Tugas Akhir ini adalah menghasilkan alternatif perencanaan struktur gedung Hotel Harvest dengan metode pracetak, yang sebelumnya atau kondisi exsistingnya menggunakan beton cor di tempat. Merencanakan detailing penulangan dan sambungan pada elemen beton pracetak. Merencanakan struktur basement, merancang gambar teknik dari hasil modifikasi gedung ini, dan merencanakan metode pelaksanaan pelat dan balok pracetak. Gedung Hotel Harvest ini memliki tinggi 6 lantai dan 3 basement. Gedung ini dirancang ulang menggunakan metode beton pracetak pada bagian balok dan pelat. Standar yang digunakan dalam perencanaan ini adalah perencanaan struktural menggunakan tata cara perhitungan struktur beton untuk bangunan gedung (SNI 2847:2013), dan tata cara perhitungan pembebanan untuk gedung (SNI 1727:2013), dan pembebanan gempa dihitung menggunakan tata cara perencanaan ketahanan gempa (SNI 1726:2012). Perencanaan gedung ini menggunakan sistem rangka pemikul momen khusus (SRPMK).
Hasil dari modifikasi gedung Hotel Harvest ini meliputi dimensi tebal pelat pracetak 9 cm dan overtopping 6 cm, dimensi balok induk setelah komposit 40/65 cm dengan dimensi balok pracetaknya 40/50 cm dan dimensi balok induk lainnya setelah komposit 30/50 cm dengan dimensi balok pracetaknya 30/45, dimensi balok anak setelah komposit 30/45 cm dengan dimensi balok pracetaknya 30/30 cm dan dimensi kolom yaitu 60x70 cm. Sambungan antar elemen pelat pracetak dengan overtopping menggunakan shear connector, untuk sambungan antara pelat dengan pelat menggunakan sambungan menerus, lalu untuk sambungan antara balok induk dengan kolom menggunakan sambungan menerus serta konsol pendek, dan sambungan antara balok anak dengan balok induk menggunakan sambungan konsol pendek. Pada tugas akhir ini juga disertakan metode pelaksanaan dari pekerjaan struktur pelat dan balok untuk satu section, satu section terdiri dari 7 balok induk, 2 balok anak dan 16 segmen pelat pracetak. Durasi untuk pekerjaan pelat pracetak untuk 1 section dengan volume beton sebesar 1,58m3 adalah ±4 jam dan durasi untuk pekerjaan balok pracetak pracetak untuk 1 section dengan volume beton sebesar 3,13m3 adalah ±5 jam, sedangkan durasi untuk pekerjaan pengecoran overtopping untuk 1 section dengan volume beton sebesar 8,25m3 adalah ±1 jam. Jadi untuk durasi pekerjaan satu section adalah ±10 jam.
========================================================================================================
Nowadays, precast method has been used in many civil construction. It happens because the using of precast concrete has several advantages compared to the in site cast concrete. The advantages are the making process isn’t depend on the weather, doesn’t need more framework, less work time, low cost, more guaranteed quality and more eco friendly.
The aim of this final project is to produce alternative structure plan of Harvest Hotel building with precast method which in the previous version uses in site cast concrete. Planning the detail of reinforcement and connection of precast concrete elements. Planning basement structure, planning technical drawing of this building modification, and to plan the implementation method of slab and precast beam. Harvest Hotel building is 6 floor building and has 3 basement. This building are replanned using the precast concrete method for beam and slab. The standart in this planning is the structural planning using the procedure of concrete structure calculation for building (SNI 2847-2013), to calculate the gravity load, PPIUG 1983 is used and the procedure of the load calculation for building (SNI 1727-2013) and the earthquake load are calculated using the planning procedures of earthquake resistance ( SNI 1726-2012). The bulding planning uses the SRPMK.
The results of this modification of Harvest Hotel building include dimensions of precast plate 9 cm and overtopping 6 cm, dimension of composite beam after 40/65 cm with precast beam dimensions 40/50 cm and dimensions of the other main beam after 30/50 cm composite with 30/45 precast beam dimensions, 30/45 cm after beam composite dimensions with precast beam dimensions 30/30 cm and the dimension of the column is 60x70 cm. The connection between precast plate elements with overtopping uses a shear connector, for the connection between the plate and the plate using a continuous connection, then for the connection between the main beam and the column using a continuous and short cantilever connection, and the connection between the child beam and the main beam uses a short cantilever connection. In this final project also included the implementation method of the work of plate and beam structure for one section, one section consists of 7 main blocks, 2 children's blocks and 16 precast plate segments. The duration for precast platen work for 1 section with concrete volume of 1.58m3 is ± 4 hours and the duration for precast pre-cast beam work for 1 section with concrete volume of 3.13m3 is ± 5 hours, while the duration for casting work is overtopping for 1 section with a concrete volume of 8.25m3 is ± 1 hour. So for the duration of work one section is ± 10 hours.

Item Type: Thesis (Diploma)
Additional Information: RSIS 690.85 Hid a-1 3100018077331
Uncontrolled Keywords: Beton Bertulang, Hotel Harvest, Modifikasi Perencanaan, Pracetak, SRPMK.
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA683 Precast concrete construction. Prestressed concrete construction.
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22301-(D4) Diploma 4
Depositing User: TAUFIQ HIDAYAT
Date Deposited: 22 Feb 2019 07:21
Last Modified: 28 Dec 2020 03:45
URI: http://repository.its.ac.id/id/eprint/57928

Actions (login required)

View Item View Item