Analisis Kapabilitas Proses Produksi Garam Beryodium Di PT. XY

Susilawati, Arning (2015) Analisis Kapabilitas Proses Produksi Garam Beryodium Di PT. XY. Diploma thesis, Institut Technology Sepuluh Nopember.

[thumbnail of 1312030063-Non Degree.pdf]
Preview
Text
1312030063-Non Degree.pdf - Published Version

Download (1MB) | Preview

Abstract

Dalam meningkatkan kebutuhan pasar akan garam, PT.
XY berinisiatif melakukan peningkatan produksi dengan metode
khusus agar produksi garam beryodium dapat optimum karena
pada tiga bulan terakhir tahun 2014 terdapat produksi garam tidak
sesuai dengan harapan perusahaan dan diperlukan pengolahan
kembali hingga 7 ton garam. Pada penelitian ini, bertujuan untuk
mengetahui bagaimana kapabilitas proses dari produksi garam
beryodium pada tahap I (bulan November-Desember 2014) dan
tahap II (bulan Februari-Maret 2015) dengan variabel yang
digunakan adalah kandungan kalium iodat (ppm) dan banyaknya
garam yodium yang lolos mesh (%). Hasil analisis pada tahap I
menghasilkan Cp sebesar 13.169 yang artinya proses produksi
pada bulan November-Desember 2014 telah kapabel. Pada tahap
II menghasilkan Cp sebesar 5.59, yang artinya proses produksi
pada bulan Februari-Maret 2015 telah kapabel.
====================================================================================================
Increasing market demand for salt, PT. XY initiative to
increase production by a special method so that the production of
iodized salt can be optimum, because of the last three months of
2014 there were no salt production in accordance with the
company's expectations and the necessary reprocessing of up to 7
tons of salt. In this study, want to determine how the process
capability of the production of iodized salt at the stage I
(November-December 2014) and stage II (February-March
2015) with variables used is potassium iodate (ppm) and the
amount of iodine salt escaped mesh (%). Results of the analysis
in stage I to produce Cp is 13.169, which means the production
process in November-December 2014 was capable. In stage II
produce Cp is 5.59, which means that the production process in
February-March 2015 was capable.

Item Type: Thesis (Diploma)
Additional Information: RSSt 519.86 Sus a
Uncontrolled Keywords: Garam Beryodium, Indeks Kapabilitas Proses, Generalized Variance, T2 Hotelling
Subjects: H Social Sciences > HA Statistics > HA29 Theory and method of social science statistics
Depositing User: Mr. Tondo Indra Nyata
Date Deposited: 30 Nov 2018 06:31
Last Modified: 30 Nov 2018 06:31
URI: http://repository.its.ac.id/id/eprint/60056

Actions (login required)

View Item View Item