Analisa Perbandingan Performa Turbin Gas Sebelum Dan Sesudah Turbine Inspection Dengan Variasi Beban Di PLTGU Blok GT 3.2 Dan GT 3.3 PT. PJB UP GRESIK

Wijaya, Aditya Ristanu (2015) Analisa Perbandingan Performa Turbin Gas Sebelum Dan Sesudah Turbine Inspection Dengan Variasi Beban Di PLTGU Blok GT 3.2 Dan GT 3.3 PT. PJB UP GRESIK. Diploma thesis, Institut Technology Sepuluh Nopember.

[thumbnail of 2112038020-Non Degree.pdf]
Preview
Text
2112038020-Non Degree.pdf - Published Version

Download (6MB) | Preview

Abstract

Pada unit pembangkitan listrik tenaga gas dan uap atau
yang biasa dikenal dengan nama PLTGU sering mengalami
perubahan beban sesuai dengan kebutuhan listrik yang diminta.
Serta jika peralatan pembangkitan tersebut dioperasikan secara
terus menerus maka akan mempengaruhi penurunan kehandalan
juga performanya. Penurunan performa tersebut akan dapat
berdampak lansung pada efisiensi serta biaya operasional yang
juga akan bertambah. Maka dari itu, perlu dilakukan sebuah cara
yang dapat menjaga performa peralatan tersebut saat
pengoperasian unit agar dalam keadaan optimal.
Proses turbine inspection merupakan sebuah maintenance
yang terjadwal di dalam pengoperasian unit. Hal ini berguna
untuk menjaga performa dari turbin gas agar tetap pada performa
terbaiknya untuk menunjang kebutuhan energi listrik sekarang.
Selanjutnya akan dihitung performa turbin gas blok GT 3.2 dan GT
3.3 pada PLTGU PT. PJB Unit Pembangkitan Gresik dengan
membandingkan performa turbin gas sebelum dan sesudah turbin
gas dengan beban yang bervariasi. Proses maintenance turbine
inspection di dalam turbin gas di PT. PJB Unit Pembangkitan
Gresik akan dijelaskan di dalam tugas akhir ini.
Setelah dilakukan perhitungan, dapat disimpulkan bahwa
turbin gas blok GT 3.2 dan GT 3.3 PT. PJB Unit Pembangkitan
Gresik memiliki performa yang lebih baik setelah dilakukan
turbine inspection. Performa dari turbin gas tersebut dapat dilihat
v
dari efisiensi yang naik setelah turbin inspection yang akan
berpengaruh pada konsumsi bahan bakar yang berkurang saat
dengan beban yang bervariasi yang dapat mengurangi biaya
produksi dari unit pembangkitan tersebut
=====================================================================================================
Gas & Steam Power Plant known as PLTGU, usually had
experienced in change of electrical power needed. If these PLTGU
has to be operated continuously, it will affect on it’s working
pressure (pressure drop) and performance also. A decrease in
perfomance will cause bigger operational cost. Therefore, it needs
a method to keep PLTGU always on it’s peak performance.
Turbin Inspection process is a scheduled maintenance
program in order to keep PLTGU always on it’s best performance.
Furthermore, Gas Turbine performance in PLTGU PT. PJB Unit
Pembangkitan Gresik will be calculated on GT 3.2 and GT 3.3.
Calculation method will be done by comparing gas turbine
performance before and after variably loading. Turbine inspection
maintenance program will be explained further on this final
project.
After calculation process, can be drawn a conclusion that
Gas Turbine block GT 3.2 and GT 3.3 has a better performance
after turbine inspection to be done. Gas turbine performance can
be seen from the elevation of efficiency value after turbine
inspection. This condition has effected fuel consumption. It shows
that fuel consumption is reduced with variably loading. It means
that production cost of PT. PJB will be reduced also.

Item Type: Thesis (Diploma)
Additional Information: RSM 621.433 Wij a
Uncontrolled Keywords: Efisiensi, Data sebelum dan sesudah turbine inspection , Performa turbin gas, Turbin gas.
Subjects: T Technology > TJ Mechanical engineering and machinery > TJ266 Turbines. Turbomachines (General)
Divisions: Faculty of Industrial Technology > Mechanical Engineering > 21401-(D3) Diploma 3
Depositing User: Mr. Tondo Indra Nyata
Date Deposited: 19 Dec 2018 08:19
Last Modified: 19 Dec 2018 08:19
URI: http://repository.its.ac.id/id/eprint/60104

Actions (login required)

View Item View Item