Perencanaan Waktu Dan Biaya PIER 1 – PIER 8 Jembatan Taman Hiburan Pantai Kenjeran Surabaya

Ahadian, Arif Fajar and Sari, Bayu Dwi Ana Nia (2015) Perencanaan Waktu Dan Biaya PIER 1 – PIER 8 Jembatan Taman Hiburan Pantai Kenjeran Surabaya. Diploma thesis, Institut Technology Sepuluh Nopember.

[img]
Preview
Text
3112030058-3112030064-Undergraduate Thesis.pdf - Published Version

Download (8MB) | Preview

Abstract

Jembatan Taman Hiburan Pantai (THP) Kenjeran Surabaya – Jawa Timur, dimana lokasi proyek direncanakan mulai jalan Tambak Deres sampai dengan jalan Sukolilo Kenjeran. Jembatan THP Kenjeran ini direncanakan memiliki panjang total kurang lebih 470 m. Dalam proyek Akhir ini akan melakukan perencanaan waktu dan biaya Pier 1 – Pier 8 proyek Jembatan Taman Hiburan Pantai Kenjeran Surabaya. Produktivitas dan kebutuhan sumber daya setiap pekerjaan dihitung berdasarkan analisis modern oleh Ir. Soedrajat dan pengamatan yang dilakukan dilapangan, sehingga dapat diketahui metode pembiayaan dari masing-masing jenis pekerjaan dan produktivitas. Dengan aplikasi software MS. Project 2010, hasil durasi dan produktivitas tiap pekerjaaan dapat dijadikan input bersama dengan metode pelaksanaannya dan hasilnya dapat diketahui durasi pelaksanaan proyek tersebut adalah 9 (sembilan) bulan 3 (tiga) hari dengan total biaya pelaksanaan sebesar Rp 59.247.273.913,65 ========================================================================================================== Taman Hiburan Pantai (THP) Kenjeran bridge Surabaya—East Java, the project will be located at Tambak Deres streetuntilSukolilo Kenjeran street. ThisTHP Kenjeran bridge is estimated to have total lengthabout 470 m. In this final project, there will be time and cost planning of Pier 1 – Pier 8 project of Taman Hiburan Pantai Kenjeran bridge Surabaya. The productivity and the resource requirements of each job are calculated based on modern analysis by Ir.Soedrajat and field observations, so the financing method of each kind of job and the productivity can be known. Through the MS. Project 2010 software application, the results of the duration and the productivity of each job can be used as the input together with the method of the implementation and the results show that the duration of the project implementation is 9 (nine) months 3 (three) days and the total cost of the implementation is Rp 59.247.273.913,65

Item Type: Thesis (Diploma)
Additional Information: RSS 624.2 Aha p
Uncontrolled Keywords: Produktivitas pekerjaan, biaya pelaksanaan, metode pelaksanaan
Subjects: T Technology > TF Railroad engineering and operation > TF193 Estimates, costs, etc.
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22401-(D3) Diploma 3
Depositing User: Mr. Tondo Indra Nyata
Date Deposited: 21 Jun 2019 04:01
Last Modified: 21 Jun 2019 04:01
URI: https://repository.its.ac.id/id/eprint/63187

Actions (login required)

View Item View Item