Rancang Bangun Aplikasi Use Case Point Untuk Estimasi Harga Perangkat Lunak (Studi Kasus: Perusahaan DTS)

Fanani, Mukhamad Faiz (2015) Rancang Bangun Aplikasi Use Case Point Untuk Estimasi Harga Perangkat Lunak (Studi Kasus: Perusahaan DTS). Undergraduate thesis, Institut Teknology Sepuluh Nopember.

[thumbnail of 5211100043-Undergraduate Thesis.pdf]
Preview
Text
5211100043-Undergraduate Thesis.pdf - Published Version

Download (3MB) | Preview

Abstract

Perusahaan DTS merupakan perusahaan yang bergerak dalam
bidang pengembangan perangkat lunak berbasis proyek. Sebelum
proyek pengembangan perangkat lunak dikerjakan, tim
pengembang di DTS melakukan estimasi nilai harga proyek
perangkat lunak terlebih dahulu untuk kemudian dibuatkan
dokumen penawaran. Namun, sebelum dokumen penawaran
dibuat, tim pengembang harus melaporkan dulu kepada direktur
untuk dilakukan validasi. Setelah itu, dokumen penawaran
dicetak oleh sekretaris.
Selama proses estimasi, tim pengembang sering menemui
beberapa permasalahan. Pertama, dalam proses estimasi harga
perangkat lunak, tim pengembang berbeda pendapat antara
anggota satu dengan anggota lainnya. Hal ini karena dalam
menentukan harga, masih menggunakan pendapat masingmasing
individu tanpa ada dasar yang jelas. Kedua, dalam
melakukan validasi proyek, direktur kesulitan dalam memberikan
keputusan apakah nilai proyek yang diajukan oleh tim
pengembang terlalu murah atau terlalu mahal. Ketiga, terkadang
dalam melakukan estimasi harga, direktur dan tim pengembang
sering salah paham karena tim tidak melaporkan hasil estimasi
untuk dilakukan validasi.
vi
Oleh karena itu, aplikasi Use Case Point sangat dibutuhkan
untuk estimasi harga perangkat lunak berdasarkan metode Use
Case Point (UCP) dan proses bisnis perusahaan DTS. UCP
merupakan metode untuk menentukan usaha (Effort) berdasarkan
Use Case. Nilai Effort kemudian diubah kedalam bentuk nilai
biaya. Sebenarnya, terdapat beberapa metode dalam estimasi
usaha(Effort), salah satunya yaitu Metode Use Case Point(UCP).
Metode estimasi menggunakan Use Case Point dipilih karena
metode ini memiliki keakuratan lebih tinggi dibanding dengan
metode lainnya.
Metode pengembangan perangkat lunak untuk membuat aplikasi
Use Case Point adalah metode incremental model. Metode
incremental model dipilih karena dapat meminimalisir
ketidaksesuaian antara kebutuhan pengguna dengan aplikasi
yang sudah dibuat.
Hasil dari pengerjaan tugas akhir peneliti ini berupa Aplikasi
Use Case Point melalui 3 kali increment. Increment pertama
ditambahkan fitur estimasi usaha. Increment kedua ditambahkan
fitur biaya, increment ketiga ditambahkan fitur-fitur untuk
melakukan kalibrasi perhitungan estimasi. Selain itu, dihasilkan
dokumen Spesifikasi Kebutuhan Perangkat Lunak (SKPL),
Deskripsi Perancangan Perangkat Lunak (DPPL), dokumen
pengujian, dan dokumen panduan.
=======================================================================================================
DTS Corporation is a company that focused in developing
application based project. Before start to be developed, DTS’s
developer team estimate about the price of the project. After that,
they submit bidding document to client for approving. And then,
printed out by secretary.
During estimation process, developer team often faced some
problems. First, Developer Team have difficulties to estimate
about the price of the project dan sometimes having different
argument with team member. It’s happened because they have no
standard or rigid procedure to estimate the price of the software,
So they estimate the software price by feeling of each other.
Secound, director feel difficult to decide or validate the result of
estimation reported by team. Director feel afraid wheter the
estimation result done by developer team is higer or lower. Third,
sometimes director have miss communication with developer
team because developer team forget to report result of the
estimation.
viii
Because of that, researcher develop Use Case Point Cost
Estimate Software based Use Case Point (UCP) method and
business process of the cost estimation in DTS Corporation. UCP
is method that used for estimate Effort. The Effort and then will
be converted to form of cost value. Actually, there are some Effort
estimate methods, Use Case Point (UCP) is one of them. Use
Case Point method is chosen because the accuration of the
estimate result is higher than another method.
The Development methodology that chosen for develop Use Case
Point Aplication is incremental model. The reason for chosing
this methodology is because incremental model can avoid
incompacitibility between application and user needs.
The result of this final project is Use Case Point Cost Estmate
Software through three times of increment. The first increment
added feature Effort estimate, second increment added feature
cost estimate, third increment added feature that peform calibrate
estimation result. Additionally, generated documents Software
Requirment Spesification (SRS), Software Design Description
(SDD), Testing Documentation, and User Guide

Item Type: Thesis (Undergraduate)
Additional Information: RSSI 005.1 Fan r
Uncontrolled Keywords: UCP, Effort, Incremental Model, SKPL, DPPL, dan Aplikasi Use Case Point
Subjects: Q Science > QA Mathematics > QA76.758 Software engineering
Divisions: Faculty of Information Technology > Information System > 57201-(S1) Undergraduate Thesis
Depositing User: Mr. Tondo Indra Nyata
Date Deposited: 01 Oct 2019 02:31
Last Modified: 01 Oct 2019 02:31
URI: http://repository.its.ac.id/id/eprint/70920

Actions (login required)

View Item View Item