Studi Kelayakan Ekonomi Pembangunan Flyover Pada Simpang Gejayan, Yogyakarta

Sari, I Gusti Agung Dwitya Indah (2016) Studi Kelayakan Ekonomi Pembangunan Flyover Pada Simpang Gejayan, Yogyakarta. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
3112100003-undergraduate-theses.pdf - Published Version

Download (3MB) | Preview

Abstract

Kemacetan merupakan sebuah permasalahan yang harus dihadapi warga Yogyakarta. Salah satu hal yang menjadi penyebab kemacetan di Yogyakarta adalah ruas jalan yang sudah tidak mampu lagi menampung volume kendaraan yang selalu bertambah setiap harinya namun tidak dibarengi dengan peningkatan fasilitasnya. Salah satu contoh daerah rawan macet di Yogyakarta adalah Persimpangan Gejayan. Jalan Gejayan sering sekali terjadi kemacetan, khususnya pada jam berangkat dan pulang kantor. Mengingat hal tersebut sudah menjadi keharusan pemerintah Yogyakarta untuk membantu pembangunan infrastruktur yang mampu memecahkan permasalahan tersebut, salah satunya dengan pembangunan flyover atau jalan layang di simpang Gejayan. Dengan dibangunnya Flyover pada pesimpangan Gejayan ini diharapkan dapat menghemat waktu tempuh pengguna jalan dengan melewati flyover dibandingkan jalan eksisting. Oleh karena itu Penulis bermaksud membuat Tugas Akhir mengenai Studi Kelayakan Ekonomi Pembangunan Jalan Layang (flyover) Simpang Gejayan, Yogyakarta. Dalam Tugas Akhir ini akan dianalisis volume lalulintas yang melewati jalan eksisting serta volume lalulintas rencana yang akan melewati jalan layang (flyover) yang dibangun nantinya dengan cara melakukan forecasting untuk v memperkirakan jumlah kendaraan pada tahun mendatang. Analisis trip assignment juga dilakukan untuk mengetahui berapa persentase jumlah kendaraan yang melewati jalan eksisting serta flyover. Analisis kelayakan ditinjau dari segi lalu lintas dan ekonomi. Kelayakan lalu lintas dilakukan dengan membandingkan Derajat Kejenuhan (Dj) eksisting dan rencana. Kelayakan ekonomi menganalisis biaya operasional kendaraan (BOK) menggunakan metode Jasa Marga. Analisis kelayakan flyover ini mengacu pada Pedoman Kapasitas Jalan Indonesia 2014 (PKJI), serta pengumpulan data primer yang didapatkan dari hasil survey traffic counting. Berdasarkan hasil perhitungan yang dilakukan, didapatkan Dj<1 pada masing- masing arah pada tahun 2016 dimana Dj pada masing- masing arah yaitu 0,95 pada arah Utara, 0,96 pada arah Selatan, 0,74 pada arah Timur dan 0,89 pada arah Barat. Namun pada hasil forecast berdasarkan peningkatan jumlah kendaraan, akan terjadi kejenuhan pada keempat ruasnya dimana Dj>1 yaitu pada tahun 2021. Derajat kejenuhan akan menurun pada jalan eksisting setelah beroperasinya flyover pada tahun 2018 yang disertai dengan pelebaran dimana DJ menjadi 0,30 pada arah Timur dan 0,38 pada arah Barat. Berdasarkan hasil analisis kelayakan dari segi ekonomi akan didapatkan nilai Benefit Cost Ratio (BCR) sebesar 7,030 >1 serta Net Present Value (NPV) sebesar Rp 2.311.691.738.573 >0. Sesuai persyaratan untuk analisis kelayakan ekonomi, rencana pembangunan flyover Gejayan ini dapat dikatakan layak. ======================================================== Congestion is a problem that always occurs in a big city like Yogyakarta. One of the things that cause congestion in Yogyakarta is roads that are no longer able to accommodate the volume of vehicles that increase every day, without increasing the facilities. One example of crwoded area in Yogyakarta is Gejayan intersection. The congestion in Gejayan intersection often occurs especially on peak hour where the people go to the office in the morning and when they go home in the evening. Because of that problem, the government have to solved this and make the infrastructure better. One of the solution isbuild a flyover or overpass at the intersection. With the construction of a flyover at Gejayan intersection, we hope can save travel time by passing the flyover than passing the existing road. Therefore the author intends to make the Final Feasibility Study on Development Economics Overpass (flyover) on Gejayan Intersection, Yogyakarta. In this final project will be analyzed the volume of traffic passing through the existing road and traffic volume plan that will pass the overpass ( flyover ) after the flyover done. Analysis trip assignment was also conducted to determine the percentage of vehicles that passing through the existing road and flyover . The feasibility analysis in terms of traffic and economy. Feasibility traffic is done by comparing the degree of saturation ( Dj ) existing and planned . The economic feasibility of vehicle vii operating cost (BOK )analysisby using the method of Jasa Marga. This flyover feasibility analysis based on Indonesian Highway Capacity Manual 2014 ( PKJI ) and the primary data obtained from the traffic counting. Based on the calculations, we get Dj < 1 in each direction in 2016 where Dj in each direction are 0.95 on the North direction , 0.96 in the South, the East is 0.74, and 0.89 in the direction from West. Although on forecast results based on the increased number of vehicles , the saturation will be increase in all direction where Dj > 1 in 2021. the degree of saturation will decline after the operation of the existing road flyover in 2018 where DJ is 0.30 in the East and 0.38 in the West . Based on the analysis of economic feasibility we will get the value of Benefit Cost Ratio ( BCR ) of 7,030 > 1 and Net Present Value ( NPV ) of Rp 2.311.691.738.573 > 0 . Appropriate requirements to economic feasibility analysis , the plan of Gejayan flyover can be said to be feasible .

Item Type: Thesis (Undergraduate)
Additional Information: RSS 624.2 Sar s
Uncontrolled Keywords: Flyover Gejayan Yogyakarta, analisis kelayakan ekonomi, studi kelayakan
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA444 Reinforced concrete
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: EKO BUDI RAHARJO
Date Deposited: 24 Oct 2019 09:06
Last Modified: 24 Oct 2019 09:06
URI: https://repository.its.ac.id/id/eprint/71399

Actions (login required)

View Item View Item