Redefinisi Proses Bisnis Perencanaan Produksi Jangka Panjang Dan Menengah Berdasarkan Best Practice Solusi Sap (Studi Kasus : Pt. Perkebunan Nusantara Xi)

Rifqi, Azhari Azizah (2016) Redefinisi Proses Bisnis Perencanaan Produksi Jangka Panjang Dan Menengah Berdasarkan Best Practice Solusi Sap (Studi Kasus : Pt. Perkebunan Nusantara Xi). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
3215111005-master-theses.pdf - Published Version

Download (10MB) | Preview

Abstract

Kebutuhan akan kesehatan merupakan hal yang sangat penting bagi masyarakat. Keberadaan fasilitas kesehatan seperti rumah sakit dibutuhkan di setiap kota untuk memenuhi kebutuhan tersebut. Hal ini sejalan dengan pengembangan Bisnis Pelindo III yang pesat dan akan mengadakan pengembangan sarana dan prasarana kesehatan. Jenis dan kelas rumah sakit yang akan dirancang perlu disesuaikan dengan kebutuhan di lokasi perancangan. Perancangan rumah sakit terletak di pusat Kota Banjarmasin yang sangat strategis. Rumah sakit yang akan dibangun adalah rumah sakit umum tipe C. Fasilitas yang disediakan pada rumah sakit ini harus sesuai dengan standar Kementrian Kesehatan tentang rumah sakit tipe C agar rumah sakit dapat berfungsi dengan maksimal. Rumah sakit ini dikembangkan sebagai Rumah Sakit Pelabuhan sesuai dengan rencana pengembangan bisnis Pelindo III dan lokasi tapak yang berada di tepi sungai Martapura. Fasilitas tambahan direncanakan pada rumah sakit ini yaitu adanya akses ambulans dari arah sungai untuk kebutuhan akses pasien darurat yang datang dari arah sungai Martapura. Perancangan Rumah Sakit PHC ini menjadi bagian dari peningkatan mutu pelayanan dan pemerataan kesehatan di Kota Banjarmasin. Pembangunan dilaksanakan di lahan kosong milik Pelindo III dan diharapkan dapat meningkatakan nilai kawasan dan tidak menimbulkan dampak negatif terhadap lingkungan. Oleh karena itu digunakan konsep green building pada perancangan rumah sakit yaitu dengan penggunaan green façade pada bangunan parkir, penggunaan penghalang panas matahari, pemanfaatan kembali air hujan, pengolahan limbah yang tepat, dan memperbanyak ruang hijau pada tapak. Pembangunan rumah sakit PHC ini juga harus mempertimbangkan konsep jejaring dengan RS PHC induk yang berada di Surabaya tanpa meninggalkan elemen lokalitas setempat. ========================================================== The need for health is very important for the community. The existence of health facilities such as hospitals are required in each city to meet those needs. This is in line with the business development of Pelindo III rapid and will hold the development of health infrastructure. The hospital type and class will be designed based on the needs in the site. The design of the hospital is located in the downtown of Banjarmasin that very strategic. The hospital will be built is a public hospital type C. The facilities provided at these hospitals must comply with the Health Ministry standard about the type C hospital so that the hospital can function optimally. This hospital was developed as Harbor Hospital in accordance with business plan development of Pelindo III and the location of the site is on the edge of the river Martapura. Additional facilities are planned at this hospital is ambulance access from the river to accomodate the needs of emergency patients coming from the Martapura river. The design of this PHC Hospital became part of improving quality of care and equity of health in Banjarmasin. Development held in vacant land belonging to Pelindo III and is expected to increase the value of the area and does not have a negative impact on the environment. Therefore, it use green building concepts in the design of the hospital. That concept is by the use of green façade of the building parking, use of solar thermal barrier, reuse rain water, proper sewage treatment, and increase green space on the site. PHC's hospital development should consider the concept of networking with RS PHC in Surabaya without leaving the local locality element.

Item Type: Thesis (Undergraduate)
Additional Information: RPA 725.51 Rif p-1
Uncontrolled Keywords: Rumah Sakit Umum, Kelas C, green building, Banjarmasin
Subjects: N Fine Arts > NA Architecture > NA2542.36 Sustainable architecture
Divisions: Faculty of Architecture, Design, and Planning > Architecture > 23201-(S1) Undergraduate Thesis
Depositing User: EKO BUDI RAHARJO
Date Deposited: 14 Nov 2019 08:49
Last Modified: 14 Nov 2019 08:49
URI: https://repository.its.ac.id/id/eprint/71799

Actions (login required)

View Item View Item