Perencanaan Dermaga Island Berth Untuk Kapal Tanker 85.000 Dwt Untuk Loading Oil Product : Bbm Ron 85 Di Tersus Pt Badak Ngl, Bontang

Utami, Adita (2016) Perencanaan Dermaga Island Berth Untuk Kapal Tanker 85.000 Dwt Untuk Loading Oil Product : Bbm Ron 85 Di Tersus Pt Badak Ngl, Bontang. Undergraduate thesis, Institut Teknologi Sepuluh Nopember Surabaya.

[img]
Preview
Text
3112100145-undergraduate-theses-.pdf - Published Version

Download (5MB) | Preview

Abstract

Seiring dengan peningkatan permintaan Bahan Bakar Minyak (BBM) jenis premium yang diprediksi oleh BUMN minyak dan gas (MIGAS) sebesar 31 juta kiloliter dimulai dari tahun 2013, maka PT. Pertamina (Persero) berencana untuk meningkatkan kapasitas kilang-kilang minyak yang ada dengan cara melakukan pengembangan untuk kilang baru yang akan diletakkan pada area offshore PT. Badak NGL Bontang. Kilang tersebut direncanakan mengalami penambahan kapasitas produksi sebesar 200.000 barel/hari. Untuk mendukung peningkatan kegiatan produksi dan pengiriman Bahan Bakar Minyak Premium diperlukan adanya suatu dermaga yang dapat melayani peningkatan arus bongkar muat minyak yang akan meningkat seiring dengan peningkatan produksi. Dermaga Island Berth yang direncanakan adalah dermaga minyak untuk kapal tanker dengan kapasitas 85000 DWT. Perencanaan dermaga baru ini telah diwujudkan dalam bentuk gambar rencana pengembangan dermaga. Namun untuk mewujudkan pembangunan dermaga tersebut diperlukan detail engineering desain yang meliputi perencanaan loading platform, breasting dolphin, mooring dolphin, catwalk, dan floating pontoon. Selain detail engineering desain perlu juga ditinjau ii kebutuhan kedalaman perairan pada area dermaga Island Berth, hal ini dikarenakan kedalaman perairan harus mencukupi draft dari kapal 85.000 DWT yang direncanakan akan bersandar di dermaga minyak PT. Pertamina (Persero). Pengerjaan konstruksi dermaga Island Berth sepenuhnya dilakukan di laut, sehingga dalam pengerjaannya digunakan kapal pontoon sebagai direksi kit. Perencanaan dermaga Island Berth ini mencakup perencanaan fasilitas laut, perencanaan struktur dermaga, dan perencanaan alat-alat yang digunakan untuk proses bongkar muat. Selain itu perlu juga direncanakan terkait metode pelaksanaan pembangunan yang akan digunakan dalam pembangunan dermaga tersebut. Dalam perencanaan dermaga juga harus ditinjau terkait rencana anggaran biaya dari dermaga tersebut. Dari hasil analisis perhitungan didapatkan kebutuhan dermaga dengan ketentuan Loading Platform sebesar 35,5 x 24 m2, Breasting dolphin 8 x 8 m2, Mooring Dolphin 6,5 x 6,5 m2 ,Catwalk dengan panjang 24, 28, dan 30 meter, dan struktur floating pontoon. Rencana anggaran biaya yang diperlukan untuk pembangunan dermaga ini adalah Rp. 192. 194.800.00 ============================================================ The increasing needs of fuel which is predicted by BUMN Oil and Gas division is about 31 million ton/year start from the beginning of 2013, so PT. Pertamina (Persero) have a planned to increase the capasity of the fuel refinary by develop new refinary which is located in the offshore area of PT. Badak NGL, Bontang. These refinaries were planned to increase the capasity of BBM RON 85 about 200.000 barrel/day. In order to support the increasing of production and distribution of fuel, the port need to be able to serve ships which has bigger capasity by the increasing of fuel’s production. Island Berth’s design is expected to be able to handle ship up to 85000 DWT. The drawing of this Island Berth have been planned as a dock development. In order to realize this project, there should be a detail of engineering design of the Island Berth include : loading platform structure, breasting dolphin, mooring dolphin, catwalk, and floating pontoon. Besides the detail of engineering design, there should be an evaluation to evaluate the depth of the Island Berth’s area because of the depth should be sufficient for draft of 85000 DWT tankershp which si plan to berthing on the dock of PT. Pertamina (Persero). iv The construction of the Island Berth is on the offshore area, so during the construction process using pontoon ship as the direction keet. The objective development of this Island Berth contain of offshore fasilities, dock structure, and equipments which is used for loading and unloading of oil product. Besides, there should be plann for the construction method of the Island Berth. In the dock development, there should be budget plan of the project. From the construction analysis, the requirement of the dock design are : loading Platform 35,5 x 24 m2, Breasting dolphin 8 x 8 m2, Mooring Dolphin 6,5 x 6,5 m2 ,Catwalk 24, 28, and 30 meter, andd floating pontoon structure. The budget plan to construct this project is about Rp. 192. 194.800.000.

Item Type: Thesis (Undergraduate)
Additional Information: RSS 627.98 Uta p
Uncontrolled Keywords: Dermaga Island Berth, Kapal Tanker 85000 DWT, Struktur Dermaga, Metode Pelaksanaan, Rencana Anggaran Biaya.
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering > TC1680 Offshore structures
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: EKO BUDI RAHARJO
Date Deposited: 09 Dec 2019 06:52
Last Modified: 09 Dec 2019 06:52
URI: https://repository.its.ac.id/id/eprint/72303

Actions (login required)

View Item View Item