Metode beton pracetak (precast) adalah teknologi konstruksi struktur beton dengan komponen-komponen yang dicetak terlebih dahulu pada suatu tempat khusus (fabrication) dan selanjutnya dipasang di lokasi proyek (installation). Pemakaian metode beton pracetak (precast) memiliki beberapa kelebihan dibandingkan metode konvensional. Kelebihan tersebut meliputi waktu pengerjaan yang relatif singkat, proses produksinya tidak tergantung cuaca, tidak memerlukan tempat penyimpanan material yang luas, kontrol kualitas beton lebih terjamin, hemat akan bekisting dan penopang bekisting, serta kemudahan dalam pelaksanaannya sehingga dapat mereduksi durasi proyek dan secara otomatis biaya yang dikeluarkan menjadi lebih kecil. Struktur gedung tower C apartemen Aspen Admiralty Jakarta Selatan pada kondisi sebenarnya menggunakan metode cor setempat dan memiliki tinggi 23 lantai dan basement 2 lantai. Gedung ini telah dirancang dengan tinggi 15 lantai dengan menggunakan metode beton pracetak. Elemen pracetak hanya balok dan pelat, sedangkan pada elemen kolom, dinding geser, tangga, lift, dan pondasi direncanakan menggunakan metode cor ditempat. Gedung ini dirancang menggunakan Sistem Ganda dengan rangka pemikul momen menengah yang mampu menahan paling sedikit 25 persen gaya gempa yang ditetapkan dan dinding geser beton bertulang khusus yang mampu menahan 75 persen gaya gempa yang ditetapkan. vi Hasil dari modifikasi gedung tower C apartemen Aspen Admiralty Jakarta Selatan ini meliputi ukuran balok induk 50/70, ukuran balok anak 30/50, dan ukuran kolom 70x70 cm. Modifikasi gedung ini juga menggunakan shear wall yang juga difungsikan sebagai dinding lift. Sambungan antar elemen pracetak menggunakan sambungan basah dan konsol pendek. =========================================================== Precast method is concrete construction technology using components which casted first at fabrication and then casted in project location (installation). This method has several advantages than conventional method. Those advantages encompass brief processing time, the production process not depending at weather, unnecessary too much space of material storage, guaranteed quality control of the concrete, scanty amount of formwork, and the least but not least, the ease of implementation can reduce the project duration and also the project cost that needed is smaller. Aspen Admiralty Apartment South Jakarta’s Tower C building structure in real condition used in situ concrete pouring method and it has 23 floors and 2 floors of basement. The Apartment was planned with 15 floors using precast method. The precast elements only beams and slabs, whereas in column elements, shear wall, stair, lift and footing elements were planned with in situ cast. This building was planned using Dual System with secondary moment bearer frame that could afford at least 25% eathquake force and particular reinforcement concrete shear wall that bearing 75% earthquake force that settled. The modification result of Aspen Admiralty Apartment South Jakarta’s Tower C encompass 50/70 primary beam dimension, 30/50 secondary beam dimension, and 70x70 cm column dimension. This building modification also using shear viii wall that functioned as lift wall. Connector between precast elements using wet connection and bracket.

Item Type: Thesis (Undergraduate)
Additional Information: RSS 690.831 4 Sya m-1
Uncontrolled Keywords: Aspen Admiralty, Sistem Ganda, Beton Pracetak, Dinding Geser.
Subjects: N Fine Arts > NA Architecture > NA7115 Domestic architecture. Houses. Dwellings
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: EKO BUDI RAHARJO
Date Deposited: 03 Jan 2020 08:51
Last Modified: 03 Jan 2020 08:51
URI: https://repository.its.ac.id/id/eprint/72530

Actions (login required)

View Item View Item