Perancangan Lean Production System Dengan Pendekatan Cost Integrated Value Stream Mapping Pada Divisi Kapal Niaga Studi Kasus PT PAL Indonesia

Firmansyah, Farich (2015) Perancangan Lean Production System Dengan Pendekatan Cost Integrated Value Stream Mapping Pada Divisi Kapal Niaga Studi Kasus PT PAL Indonesia. Masters thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
9113201302-Master_Thesis.pdf - Accepted Version

Download (12MB) | Preview

Abstract

Kesuksesan industri galangan kapal terutama untuk lini bisnis pembangunan kapal baru, sangat bergantung dengan faktor daya saing industri tersebut terhadap kompetitor. Salah satu cara untuk meningkatkan daya saing perusahaan adalah dengan menciptakan sebuah proses bisnis yang efektif dan efisien untuk memenuhi target biaya dan waktu delivery. Pertumbuhan galangan kapal di Indonesia yang mencapai 15% hingga tahun 2013 menunjukkan betapa pentingya sektor maritim bagi Indonesia agar dapat bersaing dengan galangan kapal asing. Penelitian ini bertujuan untuk merancang tools yang sederhana untuk membantu manajemen operasional dan pelaksana teknis dalam memahami aliran produksi pembangunan pembangunan lambung kapal saat ini serta memberikan dasar dengan analisa proses melalui VSM untuk mengembangkan aliran produksi dan mendesain aliran produksi yang lebih baik di masa depan dengan menghilangkan pemborosan, dan melakukan integrasi dengan pembiayaan menggunakan pendekatan activity based costing untuk mendapatkan analisa biaya produksi secara menyeluruh didasarkan pada aktivitas produksi. Dari rancangan current state value stream mapping diperoleh hasil identifikasi waste yang terjadi di lantai produksi berupa inventory dan motion. Hasil dari penelitian berupa proposed cost integrated value stream mapping dengan future state maps menunjukkan bahwa rancangan ini mampu mengurangi waktu proses produksi hingga mencapai 8,8% dari kondisi current, yang diperoleh dengan menghilangkan waste atau pemborosan sebesar 29,2% non value added time yang ada di dalam proses current state map. Dari analisa biaya juga di dapatkan bahwa terjadi pengurangan biaya produksi per unit sebesar 21,5% setelah melakukan implementasi future state map, dimana biaya pengurangan tersebut berasal dari besar beban biaya inventory. ================================================================================================= The success of the shipbuilding industry, especially for new ship construction business line, highly dependent on the factor of competitiveness of the industry against competitors. One way to improve the competitiveness of the company is to create a business process that is effective and efficient to meet cost targets and delivery time. Growth shipyard in Indonesia, which reached 15% by the year 2013 shows how the importance of the maritime sector for Indonesia to compete with foreign shipyards. This research aims to design simple tools to assist operational management and technical implementation in understanding the flow of production of hull construction and provide the basis by analyzing processes through VSM to develop the production flow and to design better production flow in the future by eliminating waste, and perform integration by financing activity based costing approach to gain a thorough analysis of production costs based on production activity. From the design current state value stream mapping obtained the identification of waste that occurs on the production floor in the form of inventory and motion. Results of the research is a proposed integrated cost value stream mapping with the future state maps shows that this design can reduce the production process time up to 8.8 % of current condition, which is obtained by eliminating waste by 29.2 % non-value added time that is in the process of current state map. Of the cost analysis also get that there is a reduction in production cost per unit by 21.5 % after the implementation of the future state map, which is derived from the cost reduction of the burden of the cost of inventory.

Item Type: Thesis (Masters)
Additional Information: RTMT 658.155 2 Fir p
Uncontrolled Keywords: waste, activity based costing, value stream mapping, konstruksi lambung kapal, non-value added
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD38.5 Business logistics--Cost effectiveness. Supply chain management. ERP
Divisions: 61101-Magister Management Technology
Depositing User: Yeni Anita Gonti
Date Deposited: 20 Feb 2020 04:15
Last Modified: 20 Feb 2020 04:15
URI: https://repository.its.ac.id/id/eprint/75074

Actions (login required)

View Item View Item