Penilaian Risiko Pada Fase Konstruksi Dan Fase Operasional, Proyek Terminal Dan Tangki Minyak Mentah Di Kalimantan Timur

Febiantopo, Febiantopo, Bambang (2016) Penilaian Risiko Pada Fase Konstruksi Dan Fase Operasional, Proyek Terminal Dan Tangki Minyak Mentah Di Kalimantan Timur. Masters thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
9113202819-Master_Thesis.pdf - Accepted Version

Download (6MB) | Preview

Abstract

Obyek dari penelitian ini adalah Proyek Terminal dan Tangki Minyak Mentah di Kalimantan Timur. Fenomena risiko pada setiap Proyek Migas adalah Kecelakaan Kerja dan Pencemaran Lingkungan. Penelitian ini bertujuan untuk mengidentifikasi dan mengevaluasi risiko-risiko yang akan timbul dari Proyek tersebut, kemudian merekomendasikan program mitigasi sebagai langkah antisipasi. Metodologi yang digunakan dalam penelitian ini mengacu pada ISO- 31000 yang disesuaikan dengan kondisi setempat, yaitu melakukan observasi awal, merumuskan permasalahan, melakukan Focus Group Discussion (FGD) guna menentukan kriteria penilaian risiko, kemudian melakukan identifikasi risiko dan mengumpulkannya dalam Hazard Identification (HAZID) List. Kemudian risiko yang teridentifikasi tersebut diobservasi dengan Analisis Kualitatif berdasarkan kreteria penilaian risiko menghasilkan risiko-risiko kategori ALARP yang harus dikelola nantinya. Selanjutnya Analisis Kuantitatif terhadap risiko kategori ALARP tersebut menghasilkan Mitigation Plans sebagai tindakan yang perlu dilakukan untuk mengantisipasi risiko tersebut. Hasil penelitian membuktikan bahwa Metodologi tersebut mampu memprediksi potensi risiko seperti;SPM tertabrak/tertarik tanker,anchor dropped/dragged, seabed soil structure slip,Excavator Bucket Impact, dan tumpahan minyak. Metodologi ini juga mampu menghitung dan memberikan data empiris safeguarding equipments yang harus disiapkan serta Risk Mitigation Programs yang harus dilakukan untuk mengantisipasi potensi risiko tersebut . ================================================================================================ The object of this research is Crude Oil Terminal and Tankages Project in East Kalimantan. The risk phenomenon involved in every oil and gas project are Safety and Environmental Issues. This study aims to identify and evaluate the risks involed in the project, and recommends the safeguarding and mitigation program as a precaution. The methodology used in this research reffering to ISO-31000 frame which considering the Local Field conditions ;starting from preliminary observations, formulate problems, conduct Focus Group Discussion (FGD) , determine the risk assessment criteria, and conduct the risk identification. The Risks identified then obseved with Qualitative Analysis base on the risk assessment criteria to determin the risks that have to be manage As Low As Reasonable and Practicable (ALARP). Then the the ALARP risks observed with Quantitative Analysis to determin the detail Mitigation Plans to anticipate the risks occurance.. The research proves that the methodology is able to predict the potential risks such as SPM getting hit by vessels, dropped / dragged anchor, seabed soil structure slip, Excavator Bucket Impact, and oil spills. This methodology also able to calculate and provide the empirical data of safeguarding equipments should be prepared and Risk Mitigation Programs should be done to anticipate the potential risks.

Item Type: Thesis (Masters)
Additional Information: RTMP 658.155 Feb p
Uncontrolled Keywords: Identifikasi, Penilaian, Analisis, Mitigasi, Monitor
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management
T Technology > TP Chemical technology > TP692.5 Oil and gasoline handling and storage
Divisions: 61101-Magister Management Technology
Depositing User: Yeni Anita Gonti
Date Deposited: 04 Mar 2020 07:14
Last Modified: 04 Mar 2020 07:14
URI: https://repository.its.ac.id/id/eprint/75291

Actions (login required)

View Item View Item