Analisa Risiko Pengembalian Material Support Pada Proyek EPCI Banuwati-K Gas Compressor Platform

Khakim, Mohamad Lukman Nur (2016) Analisa Risiko Pengembalian Material Support Pada Proyek EPCI Banuwati-K Gas Compressor Platform. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 4312100017-Undergraduate_Thesis.pdf]
Preview
Text
4312100017-Undergraduate_Thesis.pdf - Accepted Version

Download (3MB) | Preview
[thumbnail of 4312100017-Paper.pdf]
Preview
Text
4312100017-Paper.pdf - Accepted Version

Download (679kB) | Preview
[thumbnail of 4312100017-Presentation.pdf]
Preview
Text
4312100017-Presentation.pdf - Presentation

Download (2MB) | Preview

Abstract

Pada pengerjaan satu proyek fixed paltform sering kali tidak hanya dikerjakan
oleh satu kontraktor saja, melainkan kerjasama dua atau beberapa kontraktor.
Namun pada kenyatannya, kerjasama di lapangan dalam pembangunan fixed
platform tidak selamanya berjalan sesuai dengan perencanaan, hal ini disebabkan
oleh beberapa faktor. Dibutuhkan sinergi yang baik antara pihak kontraktor
tersebut untuk menghindari adanya miss komunikasi yang bisa berakibat
munculnya masalah bahkan kerugian pada proyek tersebut. Salah satu contoh
permasalahannya yaitu tentang material support (sea fastening, skid shoe dan
shiping support) yang digunakan pada proses pengiriman jacket structure ke
tempat operasi sering tidak kembali kepada perusahaan kontraktor yang
mempunyai hak milik atas material tersebut. Perlu adanya metode yang sistematis
untuk mengatasi masalah material support tersebut. Pada tugas akhir ini
menganalisa faktor penyebab dan dampak tidak kembalinya material support pada
proyek EPCI BANUWATI-K GAS Compressor Platform di PT. ABC dengan
menggunakan metode Fault Tree Analysis (FTA) dan Event Tree Analysis (ETA).
Dari kedua analisa tersebut dihasilkan diagram bow-tie yang berguna untuk
mengetahui upaya pencegahan akar permasalahan dan pengurangan akibat
permasalahan tersebut. Dari hasil analisa menggunakan FTA didapatkan hasil
total peluang kejadian top event tidak kembalinya material support sebesar
0,7783. Dari diagram ETA diketahui dampak dari tidak kembalinya material
support adalah perusahaan mengalami kerugian antara Rp.350.000.000,- hingga
Rp.10.000.000.000,-. Selain kerugian finansial, perusahaan juga menanggung
dampak lain yaitu menurunnya reputasi perusahaan dan timbulnya publisitas jelek di
media lokal sampai dengan media internasional. Hasil dari kedua analisa tersebut
dikombinasikan ke dalam Bow-Tie Analysis dalam bentuk barrier untuk tindakan
pencegahan ancaman dari hasil metode fault tree analysis (FTA) dan barrier
untuk tindakan pemulihan atau pengurangan konsekuensi dari hasil event tree
analysis (ETA).
===========================================================================================================
On a fixed platforms project are not only carried out by a contractor, but two or
more contractors. Cooperation in the construction of fixed platforms is often not
according to plan, it is caused by several factors. It takes a good synergy between
the contractor to avoid miss communication may cause problems on the project.
For the example is about support material (sea fastening, skid shoe and shiping
support) used in the process of sending a jacket structure to operation place often
does not return to the contractor. It needs a systematic method to overcome the
problem of support material. In this thesis analyzes the causes and effects of EPCI
project BANUWATI-K GAS Compressor Platform PT. ABC support material is
not return, using Fault Tree Analysis (FTA) and Event Tree Analysis (ETA).
From both the analysis generated bow-tie diagram to know the prevention
measures and mitigation measures. From fault tree analysis, probability total of
top event is 0.7783. From event tree analysis diagram, the contractor lose
Rp.350.000.000, - to Rp.10.000.000.000, -. Beside, the contractor will got
another impact like decreasing the contractor reputation and bad publicity will
come out from local media to the international media. The results of both analyzes
are combined into Bow-Tie Analysis in the form of barrier to preventive measures
from fault tree analysis (FTA) and mitigation measures of the consequences from
the event tree analysis (ETA).

Item Type: Thesis (Undergraduate)
Additional Information: RSKe 658.155 Kha a 3100016067024
Uncontrolled Keywords: Analisa Risiko, Material Support, Fault Tree Analysis, Event Tree Analysis, Bow-Tie Analysis, Risk Analysis, Support Material, Fault Tree Analysis, Event Tree Analysis, Bow-Tie Analysis
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management
Divisions: Faculty of Marine Technology (MARTECH) > Ocean Engineering > 38201-(S1) Undergraduate Thesis
Depositing User: - Davi Wah
Date Deposited: 10 Mar 2020 06:56
Last Modified: 10 Mar 2020 06:56
URI: http://repository.its.ac.id/id/eprint/75413

Actions (login required)

View Item View Item