Penjadwalan Pelaksanaan Ditinjau Dari Segi Biaya Dan Waktu Pada Gedung Fakultas Syariah Universitas Islam Negeri Sunan Ampel (Uinsa) Surabaya

Vilyanto, Maulana Ardy (2016) Penjadwalan Pelaksanaan Ditinjau Dari Segi Biaya Dan Waktu Pada Gedung Fakultas Syariah Universitas Islam Negeri Sunan Ampel (Uinsa) Surabaya. Diploma thesis, Institut Teknologi Sepuluh Nopember Surabaya.

[img]
Preview
Text
3113030120-Non_Degree.pdf - Published Version

Download (4MB) | Preview

Abstract

Proyek pembangunan gedung Syariah Universitas Islam Negeri Sunan Ampel (UINSA) Surabaya memerlukan penjadwalan pelaksanaan yang ditinjau dari perhitungan biaya dan waktu pelaksanaan. Perencanaan anggaran biaya dan waktu lebih ditekankan sesuai dengan kenyataan di lapangan yaitu berdasarkan harga di lapangan sebenarnya dan sumber referensi buku: Analisa (cara modern) Anggaran Biaya Pelaksanaan karangan Ir. A Soedrajat S, dan buku referensi untuk kontraktor karangan PT PP (Persero) TBK Untuk menghitung RAP dan Penjadwalan Waktu pelaksanaan perlu dihitung terlebih dahulu volume dan produktivitas pada setiap item pekerjaan, tentunya dengan mempertimbangkan metode yang sesuai yang dapat diterapkan dilapangan berdasarkan RKS. Setelah perhitungan volume tiap item pekerjaan selesai dapat diketahui harganya dengan menggunakan harga yang ada di pasaran/lapangan setempat. Dalam menentukan durasi setiap item pekerjaan menggunakan referensi buku yang telah disebutkan diatas ataupun koefisien yang ada pada di HSPK apabila diperlukan Hasil akhir dari analisa dan perhitungan pada tugas akhir ini adalah Rencana Anggaran Biaya Pelaksanaan (RAP) atau Real Cost dan juga penjadwalan berupa kurva-S yang diperlukan sebagai acuan realisasi pelaksanaan pembangunan struktur gedung Fakultas Syariah UINSA Surabaya. ========================================================================================Building project sharia state islamic university sunan ampel (uinsa) surabaya require scheduling implementation in terms of cost and time of implementation. Budget planning time and costs is emphasized in accordance with the reality on the region of this project that the actual execution price based on primary data in accordance with the reality on the ground and source of reference books: analysis (the modern way) budget implementation arrangements ir. A soedrajat s, and reference books for essay contractor pt pp (persero) tbk To analyze the real cost and time schedule needs to be calculated in advance the volume and productivity at each work item, of course taking into account the appropriate methods that can be applied in field. After calculating the volume, price of item of works can be determined using local price or the contractor price. Then duration of each work items can be calculated based on the reference of books mentioned above, or coefficients hspk at region of this project. The final results of the analysis and calculations in this report is the final budget of projects implementation (Real Cost) and the time schedule implementation as S-Curve of the structure construction of Sharia Faculty UINSA at Surabaya

Item Type: Thesis (Diploma)
Additional Information: RSS 690.831 Vil p-I
Uncontrolled Keywords: Manajemen Proyek, Proyek Gedung, Proyek Gedung UINSA Surabaya, Biaya Pelaksanaan, Waktu Penjadwalan, Penjadwalan Pelaksanaan, Waktu dan Biaya Pelaksanaan, Kurva-S
Subjects: T Technology > TH Building construction > TH437 Building--Cost control.
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22401-(D3) Diploma 3
Depositing User: EKO BUDI RAHARJO
Date Deposited: 13 Mar 2020 03:13
Last Modified: 13 Mar 2020 03:13
URI: https://repository.its.ac.id/id/eprint/75472