Sensitivitas Investasi Proyek Pengadaan Power Supply PT PEP Sukowati

Pangestu H.W., M. Agus (2020) Sensitivitas Investasi Proyek Pengadaan Power Supply PT PEP Sukowati. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 09211850025013-Master_Tesis]
Preview
Other (09211850025013-Master_Tesis)
09211850025013-Master_Tesis.pdf

Download (13MB) | Preview

Abstract

PT PEP Sukowati sedang menjalankan proyek investasi pengadaan sistem power supply menggunakan listrik dari PT PLN. Proyek ini terdiri dari kegiatan Engineering, Procurement and Construction (EPC) fasilitas sistem tenaga listrik. Sistem power supply ini akan menjadi sistem utama untuk produksi minyak dan gas lapangan Sukowati. Dengan fungsi utama sebagai sistem produksi serta nilai investasi yang besar, maka proyek investasi ini diharapkan dapat berjalan dengan baik. Beberapa hal yang dapat mempengaruhi investasi ini antara lain variabel angka produksi yang terus mengalami penurunan setiap tahunnya. Kemudian fluktuasi variabel harga minyak yang tidak menentu dipastikan akan berpengaruh pada investasi ini.
Berdasarkan hal di atas, perlu dilakukan sensitivitas investasi sehingga dapat diketahui batas penerimaan investasi proyek, pada tingkatan berapa investasi masih ekonomis untuk dilanjutkan atau tidak. Selanjutnya akan dihitung probabilitas terhadap batas sensitivitas variabel investasi tersebut, sehingga peluang terjadinya dapat diketahui. Analisis investasi yang dilakukan adalah evaluasi Nett Present Value (NPV) menggunakan model production sharing contrac dengan sistem bagi hasil. Hasil yang didapatkan digunakan sebagai dasar analisis sensitivitas perubahan variabel investasi terhadap NPV.
Dari analisis arus kas base case diperoleh nilai NPV setelah 19 tahun masa investasi sebesar US$ 3,039,149, yang artinya pada kondisi base case, proyek ini dapat diterima untuk dilakukan. Hasil sensitivitas variabel – variabel investasi terhadap NPV diketahui batas ekonomis proyek pada variabel angka produksi adalah pada penurunan < -33% dari base case. Pada variabel harga minyak, batas ekonomis proyek adalah pada harga > US$ 34 per barel dan pada variabel perubahan tarif listrik PLN tidak signifikan terhadap keekonomian proyek. Hasil perhitungan probabilitas menunjukan peluang terjadinya perubahan variabel investasi pada batas penerimaan adalah sebesar 7% pada variabel angka produksi, 19,5% pada variabel harga minyak dan 0% pada variabel tarif listrik. Hasil dari penelitian ini dapat digunakan oleh manajemen untuk menentukan langkah strategis terkait investasi proyek power supply.
============================================================
PT PEP Sukowati is implementing an investment project procurement for power supply systems using electricity from PT PLN. The project consists of Engineering, Procurement and Construction (EPC) facilities for the electric power system. This power supply system will used as the main oil and gas production system in the Sukowati field. With its main function as a production system and high investment value, this investment project is expected to be carried out well. Things that can affect this investment include variable production figures which continue to decline each year. Then the uncertain oil price variable fluctuation will certainly affect this investment.
Based on the above, it is necessary to carry out investment sensitivity so that the investment limit of the project is known, at what level the investment is still economical to proceed or not. Then the probability of the investment variable sensitivity limit will be calculated, so that the chance of occurrence can be known. The investment analysis conducted is an evaluation of Net Present Value (NPV) using the production sharing contrac model with a profit sharing system. The results obtained are used as a basis for analyzing the sensitivity of changes in investment variables to NPV.
From the base case cash flow analysis, the NPV value after 19 years of investment is US $ 3,039,149, which means that in the base case condition, this project can be accepted. The results of the sensitivity of investment variables to the NPV can be seen that the economic limit of the project on the variable production rate is at a decrease of <-33% from the base case. On the oil price variable, the economic limit of the project is at> US $ 34 per barrel and on the variable change in the PLN electricity tariff is not significant to the economics of the project. Probability calculation results show the possibility of a change in investment variable production figures at the limit of investment acceptance is 7%, the oil price variable is 19.5% and 0% on the variable electricity tariff. The results of this study can be used by management to determine strategic steps related to investment in power supply projects.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Investasi, migas, probabilitas, sensitivitas
Subjects: T Technology > T Technology (General) > T56.8 Project Management
Divisions: Faculty of Creative Design and Digital Business (CREABIZ) > Technology Management
Depositing User: M Agus Pangestu HW
Date Deposited: 07 Aug 2020 02:05
Last Modified: 21 May 2023 14:53
URI: http://repository.its.ac.id/id/eprint/77122

Actions (login required)

View Item View Item