Perancangan Model Penentuan Lokasi Pemindahan Mesin Blowing Dan Filling: Studi Kasus Pada Perusahaan Air Minum Dalam Kemasan Di Indonesia

Nur Fadila, Rekha (2020) Perancangan Model Penentuan Lokasi Pemindahan Mesin Blowing Dan Filling: Studi Kasus Pada Perusahaan Air Minum Dalam Kemasan Di Indonesia. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 02411640000047-Undergraduate_Thesis.pdf]
Preview
Text
02411640000047-Undergraduate_Thesis.pdf

Download (2MB) | Preview

Abstract

Permintaan terhadap air minum dalam kemasan (AMDK) saat ini terus mengalami peningkatan setiap tahunnya. Sehingga perusahaan perlu meningkatkan kapasitas produksi, salah satunya dengan menambah fasilitas yang dimiliki. Namun untuk dapat bersaing dengan kompetitor, perusahaan perlu menjalankan proses bisnisnya secara efektif dan efisien. Dalam mencapai tujuan tersebut, perancangan jaringan supply chain yang baik perlu dilakukan. Salah satu keputusan strategis dalam merancang jaringan supply chain yaitu penentuan lokasi fasilitas. Selain itu, perusahaan juga dapat melakukan relokasi fasilitas jika terdapat perubahan pada faktor yang mempengaruhi efektivitas biaya. PT. X sebagai salah satu perusahaan AMDK berencana untuk memindahkan sepuluh mesin yang berada di Pandaan. Alternatif lokasi pemindahan yaitu Pabrik Kediri dan Pabrik Bojonegoro. Setiap mesin memiliki hasil produk yang berbeda-beda dan terdapat mesin yang memiliki ketergantungan satu sama lain. Sehingga akan dibuat paket-paket pemindahan mesin. Selanjutnya penentuan lokasi masing-masing mesin akan dilakukan dengan menggunakan pendekatan heuristik serta model integer linear programming. Tujuan penelitian ini yaitu untuk dapat menghasilkan solusi dengan total biaya yang paling optimum dan memberikan saran kepada perusahaan sehingga dapat mengurangi total biaya yang dibutuhkan selama lima tahun kedepan.
==================================================================================================================
The demand for bottled water is currently increasing every year. So that company needs to increase production capacity, one of which is by adding new facilities. However, to be able to compete with competitors, the company needs to carry out their business processes effectively and efficiently. In achieving these goals, a good supply chain network design needs to be done. One of the strategic decisions in designing a supply chain network is determining the location of the facility. In addition, the company can also relocate facilities if there are changes in factors that affect cost effectiveness. PT. X as one of the bottled water company plans to move ten machines located in Pandaan. Alternative relocation locations are Kediri and Bojonegoro. Each machine has a different product result and there are machines that are dependent on one another. So that machine transfer package will be made. Furthermore, the determination of the location of each machine will be carried out using a heuristic approach and integer linear programming model. The purpose of this research is to be able to get a solution with the most optimum total cost and provide advice to the company so that it can reduce the total cost required for the next five years.

Item Type: Thesis (Other)
Uncontrolled Keywords: Capacitated Multi-Product Multi Period, Integer Linear Programming, Lokasi Fasilitas, Metode Heuristik, Relokasi Mesin
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD38.5 Business logistics--Cost effectiveness. Supply chain management. ERP
Divisions: Faculty of Industrial Technology > Industrial Engineering > 26201-(S1) Undergraduate Thesis
Depositing User: Rekha Nur Fadila
Date Deposited: 19 Aug 2020 14:23
Last Modified: 20 Jun 2023 13:19
URI: http://repository.its.ac.id/id/eprint/79063

Actions (login required)

View Item View Item