Tugas Desain Pabrik Kimia Linear Low Density Polyethylene (LLDPE) dan High Density Polyethylene (HDPE) Dari Ethylene

Yudhistira, Andhika Kamal and Dharmaswabhawa, Raihan Dewakinnara (2020) Tugas Desain Pabrik Kimia Linear Low Density Polyethylene (LLDPE) dan High Density Polyethylene (HDPE) Dari Ethylene. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 02211640000063_02211640000069-Undergraduate_Thesis.pdf]
Preview
Text
02211640000063_02211640000069-Undergraduate_Thesis.pdf

Download (2MB) | Preview

Abstract

Kebutuhan polietilena di Indonesia sangat tinggi dan
tumbuh dengan cepat seiring dengan pertumbuhan ekonomi
yang cukup tinggi. Hal ini dibuktikan dengan perbandingan
data impor dan ekspor polietilena yang sangat signifikan hingga
mencapai 2,1 kali lipat. Pada tahun 2018, angka ekspor
polietilena Indonesia mencapai 3.719.500 kg, namun angka
impor jauh melampauinya, yaitu 7.832.563 kg. Hal ini menjadi
tantangan serta peluang Indonesia untuk menjawab kebutuhan
dalam negeri dengan menekan angka impor polietilena. Contoh
grade polietilena yang luas penggunaannya adalah High Density
Polyethylene atau disingkat HDPE dan juga Linear Low Density
Polyethylene atau disingkat LLDPE. Oleh karena itu
direncanakan pendirian pabrik HDPE dan LLDPE yang
beroperasi secara kontinu 24 jam selama 330 hari per tahun
dengan kapasitas produksi 125.9 kilo ton per annum (KTPA)
untuk HDPE, dan 230 KTPA untuk LLDPE dengan kebutuhan
bahan baku ethylene dalam fase gas sebanyak 359738 MT/tahun
yang dipasok langsung dari PT. Chandra Asri Petrochemical
menggunakan sistem perpipaan. Pabrik ini rencana akan
didirikan di Cilegon, Banten mulai tahun 2020, dan selesai pada
tahun 2022. Industri Petrokimia di Indonesia juga telah diatur,
memerlukan izin, dan diawasi oleh BKPM, Kementrian
Periundustrian, Kementrian Negara Lingkungan Hidup, Badan
Pengendalian Dampak Lingkungan, Kementrian Komunikasi,
dan Departemen Tenaga Kerja. Berdasarkan analisis ekonomi,
laju pengembalian modal (IRR) pabrik ini sebesar 20.7% pada
tingkat suku bunga 9.95% pertahun, dan laju inflasi sebesar
2.72% per tahun. Sedangkan untuk waktu pengembalian modal
(POT) adalah 8 tahun 11 bulan dan titik impas (BEP) sebesar
23.86% dari kapasitas produk. Umur dari pabrik adalah 10
tahun dan masa konstruksi adalah 2 tahun. Untuk memproduksi
HDPE sebanyak 125.9 KTPA dan LLDPE sebanyak 230 KTPA
diperlukan total biaya produksi per tahun (TPC) sebesar Rp
1.583.580.003.121 dengan biaya investasi total (TCI) sebesar Rp
2.050.694.962.943 dan total penjualan sebesar Rp
2.218.888.240.562 Dengan melihat aspek penilaian analisis
ekonomi dan teknisnya, maka pabrik HDPE dan LLDPE dari
ethylene ini layak untuk didirikan.

========================================
The demands of polyethylene in Indonesia is really high and always gradualy increased along with the economic growth of the country. This was proven by the comparasion between the import and export data of polyethylene that reach 2.1 times more. In 2018, the export of polyethylene in indonesia reach 3.719.500 kg, while the import was far beyond that, reaching 7.832.563. This trully become challange and opportunity for Indonesia to fulfill the demand of polyethylene in Indonesia. High density polyethylene (HDPE) and Linear low density polyethylene (LLDPE) was one of the example of polyethylene product. Thats what encourage us to make a preliminary design of HDPE and LLDPE plant that can continuously operate at 24 hours in 330 days / year with 125.9 Kilo Ton Per Annum (KTPA) production capacity for HDPE and 230 KTA for LLDPE with the needs of 359738 Metric Ton/Year Ethylene as the raw material that supplied from PT. Chandra Asri Petrochemical. This plant was proposed to be built on 2020 and will be finished on 2022. Petrochemical industry in Indonesia also already been watched and verified by BKPM and the ministry of industry, environment etc. Based on the economical analysys, the Internal Rate Of Return (IRR) of this plant reach 20.7% with the interest rate of 9.95% / year, and infaltion rate of 2.72% / year. While for the Pay Out Time are 8 years and 11 month while the Break Even Point (BEP) is 23.86% of the product capacity. This plant will last for 10 years, and will need a Total Production Cost of Rp 1.583.580.003.121 with Total Capital Investment of Rp 2.050.694.962.943, and total revenue of 2.218.888.240.562. With all of the consideration mentioned above, this proved that this HDPE and LLDPE plant are suitable to be built.

Item Type: Thesis (Other)
Uncontrolled Keywords: Ethylene, HDPE, LLDPE
Subjects: T Technology > TP Chemical technology > TP1140 Polymers
Divisions: Faculty of Industrial Technology > Chemical Engineering > 24201-(S1) Undergraduate Thesis
Depositing User: Andhika Kamal Yudhistira
Date Deposited: 19 Aug 2020 08:19
Last Modified: 02 Oct 2023 06:32
URI: http://repository.its.ac.id/id/eprint/79221

Actions (login required)

View Item View Item