OPTIMASI PENATAAN SITE LAYOUT PADA PROYEK GRAND DHARMAHUSADA SURABAYA DENGAN METODE LOGIKA FUZZY AHP

Fadhlan, Dwinanda Fadhlan (2020) OPTIMASI PENATAAN SITE LAYOUT PADA PROYEK GRAND DHARMAHUSADA SURABAYA DENGAN METODE LOGIKA FUZZY AHP. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111640000126-Undergraduate_Thesis.pdf]
Preview
Text
03111640000126-Undergraduate_Thesis.pdf

Download (2MB) | Preview

Abstract

Di dalam proses konstruksi, tentunya banyak permasalahan yang berkaitan dengan manajemen konstruksi. Dimana banyak aspek yang dapat mempengaruhi jalannya suatu proyek tersebut. salah satunya adalah manajemen tata letak fasilitas dalam suatu proyek. Hal tersebut dapat menyelesaikan permasalahan, dalam memobilisasi bahan-bahan dan peralatannya. Sehingga manajemen tata letak fasilitas ini menjadi lebih optimal.
Pada penelitian proyek Grand Dharmahusada Surabaya, Fuzzy AHP digunakan sebagai metode untuk mendapatkan nilai urutan prioritas fasiitas sementara yang terdapat pada lokasi proyek. dimana hasilnya nanti akan digunakan sebagai dasar pertimbangan untuk tindakan yang perlu dilakukan untuk mengoptimasi Site Layout. untuk memperoleh data, dilakukan dengan melakukan wawancara dengan staf ahli dan site engineer proyek. selanjutnya, perencanaan optimasi tata letak fasilitas suatu proyek akan mempertimbangkan jarak tempuh dan jumlah pekerja yang melewati fasilitas-fasilitas sementara. Pengukuran jarak dilakukan di lapangan dan disesuaikan dengan pengukuran pada draft site layout yang diberikan oleh drafter proyek. sementara untuk mengetahui nilai keamanan pada proyek digunakan rumusan safety index. nilai keamanan didapatkan melalui wawancara dengan pihak K3. hasil dari perhitungan tersebut, di evaluasi dan ditentukan site layout yang paling optimum.
Dari hasil penelitian ini. Didapatkan urutan prioritas fasilitas sementara dari yang tertinggi hingga terendah. fasilitas tersebut adalah Fabrikasi besi 1 untuk prioritas tertinggi dan stok scaffolding untuk prioritas terendah. Lalu, didapatkan site layout yang paling optimum dari beberapa opsi yang telah dicoba dengan melakukan pertukaran antar fasilitas sementara. lokasi fasilitas yang ditukar adalah Gudang K3 dengan Gudang Bata ringan dan Baja Bekisiting Kolom dengan Fabrikasi Bekisiting Kolom. dimana didapatkan nilai untuk Travelling Distance sebesar 72.660 dan nilai Safety Index sebesar 2398 Penurunan yang didapatkan melalui proses optimasi ini sebesar 1.33% dari kondisi eksisting dengan menggunakan perbadningan rumusan yang diperoleh dari kontraktor
=====================================================================================
In the construction process, of course there are many problems related to construction management where many aspects can affect the course of a project. one of them is Site Layout Management in a project. This can solve the problem, in mobilizing its materials and equipment So that the facility layout management becomes more optimized
In the Grand Dharmahusada Surabaya project research, Fuzzy AHP is used as a method to get the value of the priority order of temporary facilities found at the project site. where the results will later be used as a basis for consideration for actions that need to be taken to optimize the Site Layout. To obtain data, conducted by interviews with expert staff and project site engineers. Furthermore, planning for optimization of the facility layout of a project will consider the mileage and number of workers passing through the temporary facilities. Distance measurements are carried out in the field and adjusted to measurements on the draft site layout provided by the project drafter. Meanwhile, to find out the safety value in the project, the safety index formula is used. the value of security is obtained through interviews with K3 parties. the results of these calculations, evaluated and determined the most optimum site layout.

From the results of this study, Obtained the priority order of temporary facilities from highest to lowest. These facilities are Iron Fabrication 1 for highest priority and scaffolding stock for lowest priority. Then, we get the most optimum site layout from several options that have been tried by exchanging between temporary facilities location. The location of the facilities that were exchanged was the K3 Warehouse with the Lightweight Brick Warehouse and the Column Forming Steel with Column Forming Fabrication. where the value for the Traveling Distance is 72,660 and the Safety Index value is 2398. The decrease obtained through this optimization process is 1.33% from the existing condition using the formulation comparisons obtained from the contractor.

Item Type: Thesis (Other)
Uncontrolled Keywords: perencanaan, sitelayout, optimasi, Fuzzy AHP, planning, sitelayout, optimization, Fuzzy AHP
Subjects: T Technology > T Technology (General) > T56.8 Project Management
T Technology > T Technology (General) > T57.6 Operations research--Mathematics. Goal programming
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Dwinanda Fadhlan
Date Deposited: 19 Aug 2020 07:39
Last Modified: 31 May 2023 01:38
URI: http://repository.its.ac.id/id/eprint/79350

Actions (login required)

View Item View Item