Perancangan Profil Risiko dengan Metode Risk Based Performance Management pada PT XYZ

Rinaldi, Muhammad Ilham (2020) Perancangan Profil Risiko dengan Metode Risk Based Performance Management pada PT XYZ. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 02411640000158-Undergraduate_Thesis.pdf]
Preview
Text
02411640000158-Undergraduate_Thesis.pdf

Download (4MB) | Preview

Abstract

Industri maritim dan galangan kapal merupakan industri dengan kondisi yang cenderung dinamis. PT XYZ sebagai perusahaan dalam industri tersebut tentunya harus siap menghadapi kondisi yang dinamis tersebut. Kondisi ini pula yang membuat manajemen risiko menjadi lebih penting secara strategis. Kondisi yang dinamis tersebut dapat dihadapi dengan memosisikan risiko di antara proses manajemen strategi dan operasional perusahaan. PT XYZ memiliki visi yaitu “Perusahaan konstruksi di bidang industri maritim dan energi berkelas dunia”. Berdasarkan kondisi tersebut, masalah yang diangkat pada penelitian ini adalah bagaimana merancang profil risiko yang sesuai dengan pengukuran kinerja PT XYZ dengan menggunakan metode Risk Based Performance Management dan sesuai dengan standar manajemen risiko ISO 31000 : 2018. Penelitian ini bertujuan untuk melakukan perancangan profil risiko dan disesuaikan dengan ISO 31000 : 2018, mengidentifikasi risiko berdasarkan pengukuran kinerja perusahaan, melakukan penilaian risiko, serta menyusun strategi penanganan risiko sebagai rekomendasi. Dari penelitian ini, berhasil teridentifikasi 266 risiko yang ada pada KPI PT XYZ, dan setelah dilakukan konfirmasi dengan pihak perusahaan, ada 263 risiko yang terkonfirmasi dan dapat dilanjutkan ke proses penilaian. Proses penilaian dilakukan dengan menggunakan likelihood dan severity yang dinilai terhadap hasil analisis penyebab dan dampak dari tiap risiko. Hasil penilaian risiko didapatkan 2 risiko dengan nilai tertinggi sebesar 16, yaitu R1.15 (Penurunan produktivitas aset) dan R3.24 (Peningkatan kapasitas produksi perusahaan), dan 1 risiko dengan nilai terendah terbesar 1, yaitu R4.1 (Tidak lengkapnya assessment tools untuk melakukan assessment kompetensi jabatan). Berdasarkan hasil perhitungan, disusun strategi penanganan risiko yang dilakukan dengan mempertimbangkan nilai risiko dan risk appetite perusahaan sebesar 12. Untuk nilai risiko diatas risk appetite, maka akan diusulkan untuk menggunakan tipe strategi avoid risk, mitigate risk dan transfer risk, dan untuk nilai kurang dari atau sama dengan risk appetite, akan diusulkan untuk menggunakan tipe strategi accept risk.

=========================================================

The maritime and shipyard industry is one of the industrial sectors that have a dynamic condition. PT XYZ as a company in those industries have to cope with this dynamic condition. This condition makes risk management became more important strategically. Thus, to cope with this dynamic condition, PT XYZ can align their risks in its strategic management process and its operation. PT XYZ’s vision is “World-class construction corporate in maritime and energy industry”. The problem used in this research is how to design a risk profile that aligned with performance management used in PT XYZ using Risk-Based Performance Management and ISO 31000 : 2018. The purpose of this research is to identifying risk based on their performance management, scoring identified risk and formulating a strategy to control identified risk. As a result, there are 266 risks in performance management used by PT XYZ, and there 263 risks that have been confirmed and going to be scored. Scoring risk is done by using likelihood and severity for each risk that has been analyzed (risk cause and risk impact) beforehand. As a result of the scoring risk process, there are two risks that have the highest score (16), R1.15 (Asset productivity decreased), and R3.24 (Production capacity increased). Also, there is a risk with the lowest score (1), R4.1 (Limited assessment tools that can be used for competency assessment). Formulating strategy to control identified risk done by considering their risk appetite (12). If risks have a score greater than risk appetite (>12), the proposed strategy type will be avoiding risk, mitigate risk, and transfer risk. But if risks have a score equal or less than risk appetite (<=12), the proposed strategy type will be accepting risk.

Item Type: Thesis (Other)
Uncontrolled Keywords: Manajemen Risiko, Risiko, Profil Risiko, Risk Based Performance Management, ISO 31000 : 2018, Key Performance Indicator, : Risk Management, Risk, Risk Profile, Risk-Based Performance Management, ISO 31000 : 2018, Key Performance Indicator.
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management
Divisions: Faculty of Industrial Technology and Systems Engineering (INDSYS) > Industrial Engineering > 26201-(S1) Undergraduate Thesis
Depositing User: Muhammad Ilham Rinaldi
Date Deposited: 27 Aug 2020 04:02
Last Modified: 03 Oct 2023 02:42
URI: http://repository.its.ac.id/id/eprint/79864

Actions (login required)

View Item View Item