Perencanaan Sistem Tenaga Listrik Hybrid Untuk Menyuplai Beban Peralatan Bongkar Muat Di Pelabuhan Bawean

Wandira, Muksin (2014) Perencanaan Sistem Tenaga Listrik Hybrid Untuk Menyuplai Beban Peralatan Bongkar Muat Di Pelabuhan Bawean. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
4209100104-Undergraduate_Thesis.pdf - Accepted Version

Download (1MB) | Preview

Abstract

Pemanfaatan sumber energi secara tepat dapat meningkatkan kesejahteraan masyarakat secara umum. Sinar matahari dan angin dapat dimanfaatkan sebagai sumber energi alternatif dan sumber energi yang bisa dikatakan gratis, tidak akan pernah habis, dan tidak bersifat polusif. Energi matahari dapat diubah menjadi energi listrik dengan menggunakan panel sel surya, begitu juga dengan energi angin yang dapat diubah menjadi energi listrik dengan menggunakan turbin angin yang akan memutar generator untuk menghasilkan tenaga listrik. Tenaga listrik yang dihasilkan dari sistem pembangkit alternatif bertenaga sinar matahari dan angin ini diharapkan dapat dimanfaatkan oleh masyarakat yang tinggal di daerah terpencil terutama untuk kegiatan bongkar muat di Pelabuhan Bawean. Sistem tenaga listrik hybrid jika menggunakan panel sel surya dan turbin angin dengan perbandingan 50:50 maka dibutuhkan panel sel surya sebanyak 80 buah dan turbin angin sebanyak 2 buah. Secara umum sistem hybrid dapat diaplikasikan secara luas baik untuk beban dengan supply tegangan 1 phase maupun 3 phase. ============================================================================================================= The utilization of energy sources by exactly would be enhance the welfare of society in general. Sunlight and wind can be utilized as an alternative energy source and energy sources that can be said to be free, will never run out, and not be polusif. Solar energy can be converted into electrical energy by using solar cell panel, as well as Wind energy that can be converted into electrical energy using wind turbine that will That will twist generator to produce electric power. Electricity generated from alternative generating systems sunlight and wind is expected to be used by people living in remote areas, especially for loading and unloading activities at Bawean port. Hybrid power system if using solar cell panels and wind turbines with a ratio of 50:50 then it takes as many as 80 solar cell panels and 2 pieces of wind turbines. In general, hybrid systems can be applied widely to the load with supply voltage 1 phase or 3 phase.

Item Type: Thesis (Undergraduate)
Additional Information: RSSP 621.312 1 Wan p 3100014057671
Uncontrolled Keywords: panel sel surya, turbin angin, alternatif, hybrid.
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1322.6 Electric power-plants
Divisions: Faculty of Marine Technology (MARTECH) > Marine Engineering > 36202-(S1) Undergraduate Thesis
Depositing User: Yeni Anita Gonti
Date Deposited: 07 Oct 2020 05:35
Last Modified: 07 Oct 2020 05:35
URI: https://repository.its.ac.id/id/eprint/82089

Actions (login required)

View Item View Item