Analisis Kinerja Waktu Dan Biaya Dengan Pendekatan Probabilistic

Chaullah, Abyanza (2021) Analisis Kinerja Waktu Dan Biaya Dengan Pendekatan Probabilistic. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111740000146-Undergraduate_Thesis.pdf] Text
03111740000146-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2023.

Download (1MB) | Request a copy

Abstract

Pengukuran kinerja proyek perlu dilakukan agar
pelaksanaan proyek berjalan dengan baik. Namun pada saat ini
pengukuran kinerja menggunakan pendekatan deterministic.
Ketidakpastian dan resiko kemungkinan akan terjadi selama
proyek konstruksi dan akan mempengaruhi kinerja proyek.
Prediksi mengenai biaya akhir penyelesaian proyek dan waktu
penyelesaian proyek juga dipengaruhi oleh unsur
ketidakpastian. Maka dari itu, pengukuran kinerja dan prediksi
waktu dan biaya penyelesaian proyek perlu dilakukan dengan
memperhatikan ketidakpastian tersebut. Tujuan dari penelitian
ini ialah untuk menganalisis kinerja waktu dan biaya, serta
biaya untuk menyelesaikan proyek tanpa dan dengan
pendekatan probabilistik.
Proyek yang digunakan sebagai studi kasus adalah
proyek pembangunan Gedung Telkom Group Manyar yang
sudah selesai dilaksanakan dengan total durasi 665 hari dengan
nilai kontrak Rp 273.258,512.307,-. Metode yang digunakan
dalam penelitian ini adalah metode Probabilistic Earned Value,
dimana perkiraan biaya penyelesaian sisa pekerjaan (ETC)
3
ditinjau dari tiga kondisi yaitu Optimistic, Pessimistic, dan Most
Likely. Yang menjadi indikator dalam metode ini ialah Planned
Value (PV), Earned Value (EV), dan Actual Cost (AC). Dari
ketiga indikator tersebut dapat diketahui kinerja proyeknya.
Dari hasil analisis diketahui nilai kinerja waktu dengan
nilai SPI setiap minggu yang ditinjau selalu dibawah 1, yang
berarti proyek tersebut mengalami keterlambatan; dan kinerja
biaya dengan nilai CPI selalu diatas 1, yang berarti biaya proyek
lebih kecil dari rencana. Estimasi biaya untuk menyelesaikan
proyek dengan pendekatan probabilistic pada minggu ke-92
sebesar Rp 70.299.312.929. Hasil tersebut lebih besar
dibandingkan dengan estimasi biaya untuk menyelesaikan
proyek deterministic sebesar Rp 63.648.624.064,34. Perbedaan
tersebut sebesar 0,90539% (lebih kecil dari 5%) yang artinya
model probabilistic valid.
====================================================================================================
Project performance is analysed to ensure that the
project is running well. However, current project performance
measurement is limited to deterministic approach.. Uncertainty
and risk may occur during a construction project and will affect
project performance. This uncertainty affect the final cost
forecasting and time completion estimation. Therefore, it is
necessary to measure performance and predict the time and
cost of project completion using probabilistic approach. The
objective of this study is to analyze the performance of time and
costs, as well as costs to complete the project without and with
a probabilistic approach.
This study used Telkom group manyar building project
as case study. Total duration of this completed project was 665
days with cost Rp 273.258.512.307,-. Probabilistic Earned
value was conducted to analyse the remaining cost under three
conditions: optimistic, pessimistic and most likely. Three
indicators, namely Planned Value (PC), Actual Cost (AC),
5
Earned Value (EV) were used to analyse initial project
performance.
From the analysis, it is known that the time
performance value with the SPI value per week under review
was always below 1, which means the project was experiencing
delays; and the cost performance with the CPI value was
always above 1, which means the project cost is less than the
plan. The estimated cost to complete the project with a
probabilistic approach at week 92 is IDR 70,299,312,929. This
result is greater than the estimated cost of completing the
project without a probabilistic approach of Rp.
63,648,624,064.34. The difference is 0.90539% (less than 5%),
which means that the probabilistic model is valid.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: earned value, kinerja waktu dan biaya, prediksi waktu dan biaya, probabilistic, earned value, time and cost performance, time and cost prediction, probabilistic.
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD69.T54 Time management. Scheduling
T Technology > T Technology (General) > T56.8 Project Management
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Abyanza Chaullah
Date Deposited: 01 Mar 2021 05:06
Last Modified: 01 Mar 2021 05:06
URI: http://repository.its.ac.id/id/eprint/83011