INTEGRASI MATERIAL REQUIREMENT PLANNING (MRP) DAN JUSTIN-TIME (JIT) UNTUK PERENCANAAN KEBUTUHAN MATERIAL DAN PENJADWALAN PRODUKSI (STUDI KASUS PT. X)

Iswara, Aldian Dwi (2021) INTEGRASI MATERIAL REQUIREMENT PLANNING (MRP) DAN JUSTIN-TIME (JIT) UNTUK PERENCANAAN KEBUTUHAN MATERIAL DAN PENJADWALAN PRODUKSI (STUDI KASUS PT. X). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 09111740000085_Undergraduate_Thesis.pdf] Text
09111740000085_Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2023.

Download (2MB) | Request a copy

Abstract

Dunia Industri yang persaingannya semakin ketat saat ini mengharuskan perusahaan menghasilkan produk yang berkualitas namun harga yang kompetitif dan waktu pengiriman yang cepat. untuk itu perencanaan yang baik dan pengendalian bahan baku yang tepat akan memberikan manfaat bagi PT. X, dimana PT. X merupakan perusahaan manufaktur yang bergerak pada bidang bisnis kantong semen. Material Requirement Planning (MRP) adalah mekanisme yang ideal untuk perencanaan dan pengendalian, sedangkan Just in Time (JIT) metode yang baik dalam penjadwalan. Kemudian 2 metode tersebut diintegrasikan untuk mendapatkan hasil yang maksimal dalam perencanaan dan penjadwalan pada PT.X. Hasil penelitian ini menghasilkan penggunaan MRP dapat menurunkan biaya sebesar 5,87%. Kemudian tenaga kerja yang dibutuhkan untuk memaksimalkan waktu produksi membutuhkan rata-rata pekerja sebanyak 210 yang dibagi 3 shift dalam satu hari.==================================================================================================
Today's increasingly fierce industrial world requires companies to produce quality products at competitive prices and fast delivery times. For this reason, good planning and proper control of raw materials will provide benefits for the PT. X, where PT. X is a manufacturing company engaged in the cement bag business. Material Requirements Planning (MRP) is an ideal mechanism for planning and control, while Just in Time (JIT) is a good method of scheduling. Then the 2 methods are integrated to get maximum results in planning and scheduling at PT.X. The results of this study resulted in the use of MRP can reduce costs by 5.87%.. Then the labor needed to maximize production time requires an average of 210 workers divided by 3 shifts in one day.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Material Requirement Planning (MRP), Just in Time (JIT), Integrasi, Perencanaan Produksi, Penjadwalan Produksi. Material Requirement Planning (MRP), Just in Time (JIT), integration, Production Planning, Production Scheduling
Subjects: T Technology > T Technology (General)
T Technology > T Technology (General) > T56.8 Project Management
T Technology > TS Manufactures > TS155 Production control. Production planning. Production management
Divisions: Faculty of Business and Management Technology > Business Management > 61205-(S1) Undergraduate Thesis
Depositing User: Aldian Dwi Iswara
Date Deposited: 27 Jul 2021 14:42
Last Modified: 27 Jul 2021 14:50
URI: http://repository.its.ac.id/id/eprint/84522

Actions (login required)

View Item View Item