Perancangan Sistem Perencanaan dan Pengendalian Produksi Untuk Pabrik Air Minum Dalam Kemasan (Studi Kasus: PT X)

Kurnianto, Naufal Imam (2021) Perancangan Sistem Perencanaan dan Pengendalian Produksi Untuk Pabrik Air Minum Dalam Kemasan (Studi Kasus: PT X). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

This is the latest version of this item.

[thumbnail of 02411740000085-Undergraduate_Thesis.pdf] Text
02411740000085-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 2023.

Download (1MB)
[thumbnail of 02411740000085-Undergraduate_Thesis.pdf] Text
02411740000085-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2023.

Download (1MB)

Abstract

Penelitian ini membahas tentang perancangan sistem perencanaan dan pengendalian
produksi (PPC) di pabrik air minum dalam kemasan (AMDK). Saat ini pabrik menerapkan
strategi positioning produk kombinasi antara make to stock dan make to order untuk
memenuhi permintaan pasar. Berdasarkan data tahun 2020, pabrik masih gagal memenuhi
target produksi yang disebabkan sistem PPC yang kurang memadai. Sistem PPC masih
belum mengakomodasi perencanaan kebutuhan material sehingga sering terjadi mesin idle
akibat material yang terlambat datang. Rancangan PPC menggunakan pendekatan Closed
Loop MRP yang memungkinkan adanya feedback dari output yang dihasilkan pada sistem
sehingga sistem dapat terus dievaluasi agar menghasilkan output yang lebih baik pada
periode berikutnya. Hasil penelitian ini berupa rancangan sistem PPC dari level aggregat
hingga perencanaan material yang mengakomodasi adanya perubahan pada permintaan.
=======================================================================================================
This study discusses the design of a production planning and control system (PPC) in a
bottled drinking water (AMDK) factory. Currently, the factory is implementing a product
positioning strategy of a combination of make-to-stock and make-to-order to meet market
demand. Based on 2020 data, factories still fail to meet production targets due to an
inadequate PPC system. The PPC system still does not accommodate material requirements
planning so that engine idles often occur due to the late arrival of materials. The PPC design
uses a Closed Loop MRP approach which allows feedback from the output generated in
the system so that the system can be continuously evaluated in order to produce better
output in the next period. The results of this study are in the form of a PPC system design
from the aggregate level to material planning that accommodates changes in demand.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Pabrik AMDK, Industri Proses, Perancangan Sistem, Perencanaan dan Pengendalian Produksi, MRP, Bottled Water Factory, Process Industry, Designing System, Production Planning and Control, MRP.
Subjects: T Technology > TS Manufactures > TS155 Production control. Production planning. Production management
Divisions: Faculty of Industrial Technology and Systems Engineering (INDSYS) > Industrial Engineering > 26201-(S1) Undergraduate Thesis
Depositing User: Naufal Imam Kurnianto
Date Deposited: 11 Aug 2021 03:31
Last Modified: 11 Aug 2021 04:57
URI: http://repository.its.ac.id/id/eprint/85825

Available Versions of this Item

Actions (login required)

View Item View Item