Estimasi Waktu Dan Rencana Anggaran Pelaksanaan Proyek Pembangunan Denver Apartment Citraland Surabaya Dengan Konstruksi Half Slab

Nuha, Muh Ulin (2021) Estimasi Waktu Dan Rencana Anggaran Pelaksanaan Proyek Pembangunan Denver Apartment Citraland Surabaya Dengan Konstruksi Half Slab. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111710013023-Undergraduate_Thesis.pdf] Text
10111710013023-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2023.

Download (17MB) | Request a copy

Abstract

Proyek akhir terapan ini membahas tentang perhitungan estimasi waktu dan rencana anggaran pelaksanaan Denver Apartment dengan menggunakan konstruksi half slab precast. Denver Apartment merupakan salah satu bagian dari pembangunan gedung yang dikerjakan oleh kontraktor PT. Wijaya Karya dengan luas bangunan kurang lebih 2358 m2 dan jumlah total 37 lantai yang berlokasi di kawasan Citraland, Made, Kecamatan Sambikerep, Kota Surabaya.
Perhitungan estimasi waktu dan rencana anggaran pelaksanaan pada laporan proyek akhir ini meninjau pekerjaan struktur atas lantai 9 sampai lantai 19 dengan berdasarkan metode pelaksanaan cast in-situ yang dilakukan pada konstruksi kolom, balok, shearwall, dan tangga. Sedangkan untuk konstruksi plat lantai menggunakan metode half slab precast. Perhitungan waktu dan rencana anggara pelaksanaan dapat dilakukan dengan cara menyusun item pekerjaan, perhitungan volume pekerjaan, produktifitas, durasi, biaya dan sumber daya yang diperlukan untuk kemudian dilakukan penyusunan jadwal pada masing-masing item pekerjaan. Dalam penyusunan penjadwalan metode yang digunakan yaitu Precedence Diagram Method (PDM) yang kemudian hasil dari barchart akan dijadikan kurva S.
Hasil akhir dari proyek akhir ini yaitu metode pelaksanaan yang digunakan, waktu pelaksanaan proyek dan rekapitulasi biaya pelaksanaan.
Dari hasil analisa, didapatkan waktu pelaksanaan 285 hari kerja dengan jam kerja selama 8 jam mulai dari 08.00 – 17.00 dengan total biaya pelaksanaan sebesar Rp13.606.265.000,00.
========================================================================================================
This applied final project discusses the calculation of the estimated time and budget plan for the implementation of Denver Apartment using half slab precast construction. Denver Apartment is one part of the building construction carried out by the contractor PT. Wijaya Karya with a building area of approximately 2358 m2 and a total of 37
floors located in the Citraland area, Made, Sambikerep, Surabaya.
The calculation of the estimated time and implementation budget plan in this final project report reviews the work of the 9th to 19th floors of the superstructure based on the cast in-situ implementation method carried out on the construction of columns, beams, shearwalls, and stairs.
As for the floor slab construction using the half slab precast method. Calculation of time and implementation budget plans can be done by compiling work items, calculating work volume, productivity, duration, costs and resources needed to then make a schedule for each work item. In preparing the scheduling method used is the Precedence Diagram Method (PDM) which then the results from the barchart will be used as an S curve.
The final result of this final project is the implementation method used, the project implementation time and the recapitulation of implementation costs.
From the results of the analysis, it was found that the
implementation time was 285 working days with 8 working hours starting from 08.00 – 17.00 with a total implementation cost of Rp. 13,606,265,000.00.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Durasi, Metode half slab precast, waktu pelaksanaan, biaya pelaksanaan, penjadwalan, kurva S. Duration, half slab precast method, execution time, execution cost, scheduling, S curve.
Subjects: T Technology > T Technology (General) > T56.8 Project Management
T Technology > TA Engineering (General). Civil engineering (General) > TA683 Precast concrete construction. Prestressed concrete construction.
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Muh Ulin Nuha
Date Deposited: 01 Sep 2021 06:53
Last Modified: 01 Sep 2021 06:53
URI: http://repository.its.ac.id/id/eprint/90770

Actions (login required)

View Item View Item