Perhitungan Estimasi Waktu dan Biaya Pada Pelaksanaan Proyek PLTM Lambur 2 x 4 MW

Surya, Bekti Ari (2021) Perhitungan Estimasi Waktu dan Biaya Pada Pelaksanaan Proyek PLTM Lambur 2 x 4 MW. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111710013106-Undergraduate_Thesis.pdf] Text
10111710013106-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2023.

Download (17MB) | Request a copy

Abstract

Proyek Pembangkit Listrik Tenaga Minihidro (PLTM) Lambur
2 x 4 MW adalah salah satu proyek EPC yang dikerjakan oleh PT.
Hutama Karya. Proyek ini memiliki serangkaian bangunan yang
nantinya saling berhubungan. Dalam penelitian ini penulis akan
menghitung estimasi biaya dan waktu pelaksanaan dalam
pembangunan proyek tersebut melalui beberapa tahapan.
Perhitungan volume pekerjaan dihitung berdasarkan gambar
perencanaan, sehingga dapat diketahui sumber daya yang
dibutuhkan, metode yang digunakan, dan durasi pekerjaan.
Sedangkan Perhitungan produktivitas tenaga kerja dan alat berat
mengacu pada sumber referensi dari Ir. A. Soedrajat S, Analisa Cara
Modern Anggaran Biaya Pelaksanaan dan Lampiran Peraturan
Mentri Pekerjaan Umum Perumahan Rakyat ( Analisa Harga Satuan
Pekerjaan) 2016. Biaya yang digunakan adalah menggunakan biaya
lapangan dan hasil survey. Penjadwalan pelaksanaan proyek
menggunakan aplikasi MS Project. Data yang diinput pada MS
Project adalah item pekerjaan, durasi tiap item pekerjaan, sumber
daya, dan ketergantungan antar item pekerjaan pada pelaksanaan
proyek.
Dari hasil perhitungan didapatkan durasi dan biaya dari
pelaksanaan Proyek PLTM Lambur yang dibagi menjadi 2 item
bangunan besar. Item bangunan besar pertama terdiri dari bendung,
sandtrap, dan waterway dengan total durasi 510 hari serta item
bangunan besar kedua yang terdiri dari powerhouse, penstock dan
headpond dengan total durasi 514 hari dengan biaya Rp.
22.938.039.000
=====================================================================================================
The Lambur 2 x 4 MW Mini-hydro Power Plant (PLTM) project
is one of the EPC projects undertaken by PT. Hutama Karya. This project
has a series of buildings that will be interconnected. In this study the
author will calculate the estimated cost and implementation time in the
construction of the project through several stages.
The calculation of the volume of work is calculated based on the
planning drawings, so that the required resources, the methods used, and
the duration of the work can be known. While the calculation of labor
productivity and heavy equipment refers to a reference source from Ir. A.
Soedrajat S, Analysis of Modern Ways of Budget Implementation and
Attachment to the Regulation of the Minister of Public Works for Public
Housing (Unit Price Analysis) 2016. The costs used are field costs and
survey results. Scheduling project implementation using the MS Project
application. The data inputted in MS Project are work items, duration of
each work item, resources, and dependencies between work items on
project implementation.
From the calculation results, it is found that the duration and cost
of implementing the PLTM Lamur Project are divided into 2 large
building items. The first major building item consists of a weir, sandtrap,
and waterway with a total duration of 510 days and the second major
building item consisting of a powerhouse, penstock and headpond with a
total duration of 514 days at a cost of Rp. 22,938,039,000

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: perhitungan biaya dan waktu, metode pelaksanaan, Kurva S, penjadwalan , cost and time calculation, implementation method, S curve, scheduling.
Subjects: T Technology > TH Building construction
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Bekti Ari Surya
Date Deposited: 09 Sep 2021 09:24
Last Modified: 09 Sep 2021 09:24
URI: http://repository.its.ac.id/id/eprint/91929

Actions (login required)

View Item View Item