Pelaksanaan Pekerjaan Bored Pile Pada Proyek Pembangunan Jalan Tol Solo - Yogyakarta - NYIA Kulon Progo Seksi 1 Paket 1.1 : Solo - Klaten (STA 0+000 - STA 22+300)

Makarim, Ahmad Naufal and Setiono, Agra Wibisana (2022) Pelaksanaan Pekerjaan Bored Pile Pada Proyek Pembangunan Jalan Tol Solo - Yogyakarta - NYIA Kulon Progo Seksi 1 Paket 1.1 : Solo - Klaten (STA 0+000 - STA 22+300). Project Report. [s.n.], [s.l.]. (Unpublished)

[thumbnail of 03111840000141_03111840000148-Project_Report.pdf] Text
03111840000141_03111840000148-Project_Report.pdf - Accepted Version
Restricted to Repository staff only

Download (14MB) | Request a copy

Abstract

Pada saat ini, pemerintah Indonesia sedang giat-giatnya melakukan pembangunan terhadap infrastruktur, bangunan, dan lain-lain. Pembangunan infrastruktur dilakukan agar sarana masyarakat terpenuhi dan meningkatkan pemerataan pembangunan di Indonesia. Salah satu dari berbagai infrastruktur yang dibangun oleh pemerintah adalah jalan tol. Pembangunan jalan tol bertujuan untuk mempercepat jalannya perekonomian dengan membuat jalan bebas hambatan. Pada pelaksanaan kerja praktek ini, meninjau pembangunan Jalan Tol Solo – Yogyakarta – NYIA Kulon Progo. Dalam pembangunan Jalan Tol ini terdapat berbagai bidang yang dapat diamati, diantaranya adalah struktural, transportasi, hidrologi, dan geoteknikal. Dalam laporan, membahas tentang pekerjaan Bored Pile sebagai pondasi untuk jembatan. Dalam pembangunannya, ditemukan berbagai kendala, namun dapat teratasi dengan berbagai inovasi yang baik.
================================================================================================
Currently, the Indonesian government is actively developing infrastructure, buildings, and others. Infrastructure development is carried out so that community facilities are able to use and infrastructure development distributed well in Indonesia. One of the various infrastructures built by the government is a toll road. The construction of toll roads aims to accelerate the running of the economy by making expressways. In the implementation of this practical work, observing the construction of the Solo – Yogyakarta – NYIA Kulon Progo. In the construction of this Toll Road, there are various fields that can be observed, such as structural, transportation, hydrology, and geotechnical. In the report, discusses the construction of Bored Pile as bridge foundation. In its development, various obstacles were found, but they can be overcome with some good innovations.

Item Type: Monograph (Project Report)
Uncontrolled Keywords: Bored Pile, Jalan Tol, Infrastruktur.
Subjects: H Social Sciences > HE Transportation and Communications > HE355.4 Toll roads
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Agra Wibisana Setiono
Date Deposited: 18 Jan 2022 05:49
Last Modified: 18 Jan 2022 05:49
URI: http://repository.its.ac.id/id/eprint/92348

Actions (login required)

View Item View Item