Perhitungan Waktu dan Biaya Pembangunan Hotel Shafira Surabaya dengan Metode Precast Halfslab

Habibi, Ahmad Waldy (2022) Perhitungan Waktu dan Biaya Pembangunan Hotel Shafira Surabaya dengan Metode Precast Halfslab. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111710013049-Undergraduate_Theses.pdf] Text
10111710013049-Undergraduate_Theses.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2024.

Download (6MB) | Request a copy

Abstract

Penyusunan Proposal proyek akhir dengan judul Perhitungan Waktu dan Biaya Pelaksanaan Pembangunan Hotel Shafira Surabaya dengan Metode Half Slab yang terletak di Jl Ahmad Yani,Kelurahan Jemurwonosari,Kecamatan Wonocolo, Kota Surabaya. Proyek ini dibangun oleh PT. Tata Bumi Raya yang terdiri 1 Lantai Underground,1 Lantai Basement,dan 9 Lantai Utama.
Untuk proyek akhir ini yang ditinjau adalah bangunan utama Pembangunan Hotel Shafira mulai lantai 1 sampai dengan lantai atap dengan memodifikasi bagian pelat yang sebelumnya menggunakan pelat konvensional menjadi half slab precast. Pekerjaan yang ditinjau hanya struktur atas. Struktur atas meliputi kolom,balok,tangga, dan Plat Overtopping yang menggunakan pengecoran in-situ terkecuali pelat yang menggunakan precast. Dalam perhitungan waktu yang ditentukan dengan mengitung volume pekerjaan,produktivitas, durasi, dan kebutuhan sumber daya pada tiap- tiap item pekerjaan.
Perhitungan tersebut disesuaikan dengan metode pelaksanaan yang sesuai dan referensi dari literatur yang terkait. Sedangkan dalam perhitungan biaya meliputi harga material, upah pekerja, dan dan harga sewa alat berat yang dihitung menggunakan harga lapangan dan referensi di Surabaya. Sehingga diharapkan dengan penggunaan metode yang tepat akan menghasilkan perencanaan waktu dan biaya yang efektif dan efisien dalam pembangunan Hotel Shafira Surabaya. Hasil akhir dari Proyek akhir ini diperoleh perhitungan waktu dan biaya pelaksaan, serta kurva S pada proyek pembangunan Hotel Shafira Surabaya.
Dari hasil analisa, didapatkan durasi pekerjaan selama 274 hari dan biaya pelaksanaan sebesar Rp 15.612 429.812,00.
======================================================================================================
Preparation of the final project proposal with the title
Calculation of Time and Cost of Implementation of the Construction of
the Hotel Shafira Surabaya with the Half Slab Method located on Jl
Ahmad Yani, Jemurwonosari Village, Wonocolo District, Surabaya
City. This project wasbuilt by PT. Tata Bumi Raya which consists of 1
Underground Floor, 1 Basement Floor, and 9 Main Floors.
For this final project, what is being reviewed is the main
building ofthe Shafira Hotel Development from the 1st floor to the roof
floor bymodifying the slab which previously used conventional slabs to
become halfslab precast. The work reviewed is only the upper structure.
The superstructure includes beam columns, stairs, and Overtopping
Plates using in-situ casting except for plates that use precast. In the
calculation of the time determined by calculating the volume of work,
productivity, duration, and resource requirements for each work item.
The calculation is adjusted to the appropriate implementation
method and references from the relevant literature. Meanwhile, the cost
calculation includes material prices, worker wages, and heavy
equipment rental prices which are calculated using field prices and
references in Surabaya. So it is hoped that the use of the right method will
result in effective and efficient time and cost planning in the construction
of the Shafira Hotel Surabaya. The final result of this final project is a
recapitulation of the calculation of implementation time and costs, as
well as the S curve of the Shafira Hotel Surabaya construction project.
From the results of the analysis, the duration of the work was
274 days and the implementation cost was Rp. 15.612 429.812,00.

Item Type: Thesis (Other)
Uncontrolled Keywords: Kurva S,biaya,manajemen proyek, half slab, S curve, cost, project management
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA683 Precast concrete construction. Prestressed concrete construction.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Ahmad Waldy Habibi
Date Deposited: 22 Feb 2022 05:37
Last Modified: 31 Oct 2022 03:20
URI: http://repository.its.ac.id/id/eprint/94013

Actions (login required)

View Item View Item