Penjadwalan Pelaksanaan Proyek Pembangunan Tower Mesin Ekstend Pabrik Pakan

Utomo, Mujahidin Prasetyo (2022) Penjadwalan Pelaksanaan Proyek Pembangunan Tower Mesin Ekstend Pabrik Pakan. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 09211950023018-Master_Thesis.pdf] Text
09211950023018-Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2024.

Download (2MB) | Request a copy

Abstract

Proyek tersebut tidak hanya membutuhkan sumber daya manusia yang handal, tetapi juga harus didukung oleh manajemen yang baik. Manajemen yang baik tercermin dari perencanaan kegiatan proyek yang memadai untuk mencapai penyelesaian proyek. Metode Program Evaluation and Review Technique (PERT) merupakan salah satu alat pendukung penjadwalan yang menitikberatkan pada penjadwalan probabilistik. Cara ini dapat diterapkan dalam melaksanakan proyek, agar semua pekerjaan dapat berjalan sesuai rencana dan memberikan hasil yang lebih memuaskan.
Tujuan dari penelitian ini adalah memodelkan penjadwalan probabilistik pada proyek pengembangan area produksi pakan ternak milik PT Suri Tani Pamuka di kota Lampung, Sumatera Selatan yang dilaksanakan oleh kontraktor PT HIJ. Dalam mencari kemungkinan tercapainya waktu proyek yang direncanakan dalam time schedule dengan analisis menggunakan metode PERT, menganalisis waktu untuk menjadwal ulang kegiatan probabilistik menggunakan PERT dan dimodelkan dengan simulasi Monte carlo. Data yang digunakan adalah data proyek pengembangan area produksi pakan ternak PT XYZ. Hasil dari penelitian ini adalah target durasi proyek adalah 137-145 dengan probabilitas 90%. Durasi aktual di proyek 161 hari, sehingga probabilitas penyelesain lebih besar yaitu 95%.
====================================================================================================
The project requires not only reliable human resources, but also must be supported by good management. Good management is reflected by adequate planning project activities to achieve project completion. Program Evaluation and Review Technique (PERT) method is one of scheduling supporting tools which focuses on probabilistic scheduling. This method can be applied in carrying out projects, so that all work can go according to plan and provide more satisfactory results.
The purpose of this study was to model the probabilistic schedule for the development project of the animal feed production area owned by PT Suri Tani Pamuka in the city of Lampung, South Sumatra which was carried out by the PT HIJ contractor. In looking for the possibility of achieving the planned project time in the time schedule with analysis using the PERT method, analyzing the time to reschedule probabilistic activities using PERT and modeled with Monte carlo simulation. The data used is the project data for the development of PT XYZ's animal feed production area. The result of this research is the project duration target is 137-145 with 90% probability. The actual duration in the project is 161 days, so the probability of completion is greater that is 95%.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Planning, Time Schedule, Probabilistic, PERT & Monte carlo simulation method Perencanaan, Jadwal Waktu, Probabilistik, metode simulasi PERT & Monte Carlo
Subjects: H Social Sciences > HD Industries. Land use. Labor
H Social Sciences > HD Industries. Land use. Labor > HD69.T54 Time management. Scheduling
Divisions: Faculty of Creative Design and Digital Business (CREABIZ) > Technology Management > 61101-(S2) Master Thesis
Depositing User: Mujahidin Prasetyo Utomo
Date Deposited: 15 Feb 2022 03:00
Last Modified: 15 Feb 2022 03:00
URI: http://repository.its.ac.id/id/eprint/94061

Actions (login required)

View Item View Item