Analisi Potensi Pengembangan Terminal Project Logistics: Studi Kasus Pelabuhan Batu Ampar, Batam

Istyawati, Evita Shalma (2022) Analisi Potensi Pengembangan Terminal Project Logistics: Studi Kasus Pelabuhan Batu Ampar, Batam. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img] Text
04411740000010-undergraduate_thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 March 2024.

Download (2MB) | Request a copy

Abstract

Batam adalah kawasan industri galangan terbesar di Indonesia yang tidak hanya memproduksi kapal tetapi juga memproduksi project cargo yang biasanya diekspor ke Singapura untuk memenuhi kebutuhan fabrikasi dan galangan. Ekspor tersebut sebagian besar langsung dilakukan dari TUKS yang dimiliki dari beberapa galangan dan sebagian melewati Pelabuhan Batu Ampar. Namun, Pelabuhan Batu Ampar belum memenuhi kriteria khusus sebagai terminal project logistics. Sehingga Tugas Akhir ini bertujuan untuk mengembangkan Pelabuhan Batu Ampar sebagai terminal project logistics dengan menggunakan metode regresi dan proyeksi, serta analisis benchmarking dan analisis kesenjangan. Hasil dari penelitian ini menunjukkan bahwa Pelabuhan Batu Ampar berpotensi untuk melayani 67% muatan project logistics. Proyeksi jumlah muatan total yang akan dilayani dapat dibedakan menjadi 3 (tiga): jangka pendek, jangka menengah dan jangka panjang dengan nilai berturut – turut sebesar 2.644.004 ton, 3.558.785 ton, 6.269.812 ton. Semua skenario proyeksi membutuhkan penambahan luas lapangan penumpukan atau gudang dan fasilitas alat bongkar muat. Khusus untuk skenario jangka panjang, pelabuhan membutuhkan penambahan dermaga agar nilai BOR tidak melebihi ketentuan yang diisyaratkan oleh UNCTAD. Biaya total yang dibutuhkan untuk pengembangan pelabuhan hingga jangka panjang adalah sebesar Rp. 1,2 triliun. =============================================================================================== Batam is the largest shipyard industrial area in Indonesia that not only produces ships but also cargo projects that are usually exported to Singapore to meet fabrication and shipyard needs. The exports are mostly directly from privately marine terminals (TUKS) owned by several shipyards and some use Batu Ampar Port. However, Batu Ampar Port has not met the specification criteria as a logistics project terminal. Therefore, this Final Project aims to develop Batu Ampar Port as a logistics project port by benchmarking and gap analyses using regression and projection methods. This study shows that Batu Ampar Port has the potential as a project logistics terminal to serve 67% of the total cargo. The projected cargo is divided into 3 (three) stages: short-term, medium-term, and long-term, the value of which are 2,644,004 tons, 3,558,785 tons, 6,269,812 tons, consecutively. All projection scenarios require additional yards or warehouses and loading/unloading facilities. Especially for a long-term scenario, the port requires an additional pier so that the BOR value does not exceed the standard prescribed by UNCTAD. The total cost needed for port development to the long term amounts to IDR 1,2 trillion.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Analisis Benchmarking, Analisis Kesenjangan, BOR, Galangan, Regresi, Terminal Project Logistics
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD38.5 Business logistics--Cost effectiveness. Supply chain management. ERP
V Naval Science > V Naval Science (General) > V220 Naval ports, bases, reservations, docks, etc.
V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering
Divisions: Faculty of Marine Technology (MARTECH) > Sea Transportation Engineering > 21207-(S1) Undergraduate Thesis
Depositing User: Evita Shalma Istyawati
Date Deposited: 17 Feb 2022 08:19
Last Modified: 17 Feb 2022 08:19
URI: https://repository.its.ac.id/id/eprint/94587

Actions (login required)

View Item View Item