Perhitungan Waktu Dan Biaya Pelaksanaan Pembangunan Hotel Ibis Budget Surabaya Dengan Menggunakan Perth Construction Hire (PCH)

Basuki, Amir (2022) Perhitungan Waktu Dan Biaya Pelaksanaan Pembangunan Hotel Ibis Budget Surabaya Dengan Menggunakan Perth Construction Hire (PCH). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img] Text
10111710010085-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2024.

Download (15MB) | Request a copy

Abstract

Proyek pembangunan Hotel Ibis Budget Surabaya ini berlokasi di Jl. Biliton No. 24- 26, Kota Surabaya, Jawa Timur. Proyek ini dibangun dengan luas bangunan ± 1.122,75 meter yang terdiri dari 1 lantai basement dan 16 lantai hunian. Dalam pembangunannya, proyek ini menggunakan struktur beton bertulang. Tulangan yang digunakan difabrikasi di lokasi proyek. Secara keseluruhan sistem struktur gedung ini memiliki bentang yang cukup lebar. Sehingga memerlukan beberapa perhatian khusus pada daerah-daerah yang mengalami konsentrasi gaya seperti pada daerah balok dan kolom pada bentang yang lebar tersebut. Untuk bekisting beton yang akan digunakan pada proyek ini adalah perth construction hire (PCH). Dalam proses pengecorannya akan dilakukan menggunakan metode cast in situ (pengecoran di tempat). Data yang diperoleh dari proyek ini adalah gambar struktur dan arsitektur. Data diolah untuk dijadikan analisa bentuk, ukuran dan volume. Dari hasil pengolahan data, dapat dibuat perhitungan waktu pelaksanaan dan anggaran biaya pelaksanaan yang dibutuhkan. Untuk iv hasil akhir adalah penjadwalan yang dilakukan dengan membuat Network Planning dan Kurva S. Adapun alat bantu yang digunakan dalam menyusun penjadwalan proyek ini dengan menggunakan program Microsoft Project. Penjadwalan proyek sangat penting sebagai tolak ukur apakah proyek tersebut selesai sesuai dengan waktu yang telah direncanakan atau lebih dari waktu perencanaan. Untuk hasil durasi dan produktivitas tiap pekerjaan digunakan sebagai penjadwalan yang dapat dilakukan dengan membuat Network Planning dan Kurva S. Adapun alat bantu yang digunakan dalam menyusun penjadwalan proyek beserta dengan metode pelaksanaannya dapat dilakukan dengan menggunakan program Microsoft Project 2013. Dari perencanaan yang telah disusun didapatkan hasil durasi pelaksanaan proyek tersebut adalah 159 hari dengan total biaya sebesar Rp 4.908.102.315,11. Untuk biaya Keselamatan dan Kesehatan Kerja (K3) diambil 2.19% dari total biaya sehingga diperoleh Rp 107.487.440,70. Maka total biaya pelaksanaan sebesar Rp 5.015.589.755,81. ======================================================================================================= The project of the Ibis Budget Surabaya Hotel is located on Jl. Biliton No. 24-26, City of Surabaya, East Java. This project was built on a building area of ± 1,122.75 metersquare consisting of 1 basement floor and 9 residential floors. In its construction, this project used a reinforced concrete structure. The reinforcement used is fabricated at the project site. The overall structural system of this building has a fairly wide span. So that it requires some special attention to areas that experience a concentration of forces such as the beam and column areas in these wide spans. Concrete formwork to be used in this project is a perth construction hire (PCH). In the casting process, it will be carried out using the cast in situ method (casting in place). The data obtained from this project are structural and architectural drawings. The data is processed to be used as shape, size and volume analysis. From the results of data processing, a calculation of the implementation time and budget for the required implementation costs can be made. The final result is a scheduling that is done by creating a Network Planning and S Curve. The tools used in preparing this project scheduling are using the Microsoft Project program. Project scheduling is very important as a measure of whether the project is completed in accordance with the planned time or more than the planning time. vi For the results of the duration and productivity of each job, it is used as a schedule that can be done by making Network Planning and S Curves. The tools used in preparing project scheduling along with the implementation method can be done using the program. Microsoft Project 2013 the duration of the project implementation is 159 days with a total cost of Rp 4.908.102.315,11. For the cost of Occupational Safety and Health (OSH) 2.19% of the total cost was taken to obtain Rp. 107.487.440,70. Then the total cost of implementation is Rp. 5.015.589.755,81

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Perth Construction Hire, PCH, Waktu dan Biaya Pelaksanaan, Network Planning, Kurva S., Perth Construction Hire, PCH, Implementation of Time and Cost, Network Planning, S Curve.
Subjects: T Technology > T Technology (General) > T56.8 Project Management
T Technology > TF Railroad engineering and operation > TF193 Estimates, costs, etc.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Amir Basuki
Date Deposited: 22 Feb 2022 03:31
Last Modified: 22 Feb 2022 03:31
URI: https://repository.its.ac.id/id/eprint/94704

Actions (login required)

View Item View Item