Desain Modifikasi Struktur Apartemen Aspen Admiralty Residence Tower D Jakarta Selatan dengan mengggunakan Metode Beton Pracetak

Siagian, Simon (2017) Desain Modifikasi Struktur Apartemen Aspen Admiralty Residence Tower D Jakarta Selatan dengan mengggunakan Metode Beton Pracetak. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3112100103-Undergraduate-Theses.pdf]
Preview
Text
3112100103-Undergraduate-Theses.pdf - Published Version

Download (8MB) | Preview

Abstract

Peninjauan dari aspek kualitas produksi, waktu pelaksanaan konstruksi yang lebih cepat, serta penyelesaian finishing yang mudah menjadi target point para ahli konstruksi dalam merencanakan proyek- proyek konstruksi. Pelaksanaan yang efektif dan efisein telah mendorong para ahli konstruksi untuk menemukan metode- metode baru dalam pekerjaan konstruksi, salah satunya penggunaan metode pracetak. Pada sistem pracetak seluruh komponen bangunan dapat difabrikasi lalu dipasang dilapangan. Proses pembuatan komponen dapat dilakukan dengan kontrol kualitas yang baik. Gedung apartemen Aspen Admiralty Residence Tower D pada awalnya dirancang menggunakan metode cor di tempat (cast in situ). Gedung ini direncanakan memiliki lima belas lantai dengan satu lantai basement. Dalam tugas akhir ini, gedung dimodifikasi menggunakan metode beton pracetak. Perencanaan yang dilakukan meliputi perencanaan pelat lantai, tangga, balok induk, balok anak, kolom serta pelat atap. Komponen yang direncanakan menggunakan metode pracetak meliputi perencanaan pelat, balok anak, balok induk. Sementara untuk perencanaan kolom tetap menggunakan metode cor di tempat (cast in situ). Sambungan yang digunakan adalah sambungan basah (in situ concrete joint). Sambungan ini meliputi pada komponen beton pracetak yang terdapat besi tulangan yang keluar dari bagian ujungnya, dimana antar tulangan pada komponen pracetak tersebut nantinya akan disambung dengan beberapa bantuan. Kemudian pada bagian sambungan dilakukan pengecoran beton. Pada perencanaan struktur bawah, pondasi yang digunakan adalah grup tiang pancang dengan data yang digunakan adalah data SPT. Perhitungan efisiensi kelompok tiang pancang dihitung sesuai dengan jenis, dimensi, jarak, jumlah dan susunan kelompok tiang pancang yang digunakan. Tujuan dari tugas akhir ini yaitu menghasilkan perencanaan struktur dengan menggunakan metode pracetak yang baik dan benar yang memenuhi persyaratan keamanan struktur berdasarkan SNI 03-2847-2013 tentang Tata Cara Perhitungan Struktur Beton untuk Bangunan Gedung, SNI 03-1726-2012 tentang Tata Cara Perencanaan Ketahanan Gempa Untuk Bangunan Gedung dan PPIUG 1983 tentang Pedoman Perancangan Pembebanan Indonesia Untuk Rumah Dan Gedung.
Dengan beberapa acuan dasar tersebut diharapkan perencanaan yang telah dilakukan akan mampu menerima gaya lateral serta gaya gravitasi sehingga gedung dapat berfungsi sebagaimana mestinya serta dapat mensosialisasikan kepada masyarakat terkait bagaimana standar penggunaan peraturan baru tersebut.

=================================================================

Better production quality, faster construction time, and simpler finishing become the target of construction experts in planning their construction projects. The effective and efficient implementation has motivated construction experts to find new methods in their construction projects and one of them is by using the precast method. In precast system, all the building components can be fabricated and installed on site. The process of making components can be performed with good quality control. Aspen Admiralty Residence Tower D apartment building was originally designed using cast in situ method. It is planned to have fifteen floors with one basement. In this final project, the building is modified using the precast concrete method.
The design is carried out for the floor slabs, stairs, beams, joists, columns, and rooftop slabs. The components adopted the precast system for slabs, joists, and beams, while the columns use the cast-in-situ method. All the joints use wet connections. The connections involve the precast concrete components with the reinforcement extensions at their ends, where the reinforcement overlaps will then be concreting to become monolithic joints. For sub structure of the building, the foundation used is a group of piles and designed based on the SPT data. The efficiency of the pile group is calculated according to the types, dimensions, distances, numbers, and arrangement of piles in groups.
The objective of this final project is to provide the structural design using appropriate precast system that meets all the requirements in accordance with SNI 2847:2013 and SNI 1726:2012 as well as PPIUG 1983.
By satisfying all the code’s requirements, the design is expected to be able to resist the lateral force from major earthquakes during its service life and of course gravity load such that the building can perform safely under these loads. It is also expected that this final project can help to disseminate their applications to the public that concerning the new regulations of the building codes.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Gedung Apartemen Aspen Admiralty Residence Tower D; Modifikasi Perencanaan; Sambungan Basah; Tiang Pancang; Aspen Admiralty Residence Tower D Apartment Building; In Situ Concrete Joint; Modification Plan; Piles; Precast
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA645 Structural analysis (Engineering)
T Technology > TA Engineering (General). Civil engineering (General) > TA681 Concrete construction
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: - SIMON SIAGIAN
Date Deposited: 09 Mar 2017 01:17
Last Modified: 06 Mar 2019 04:14
URI: http://repository.its.ac.id/id/eprint/3009

Actions (login required)

View Item View Item