Analisa Anggaran Pelaksanaan Struktur Utama Beton dan Atap Baja Serta Penjadwalan Waktu Pelaksanaan Pada Gedung Teknik Pengairan Universitas Brawijaya - Malang

Ramadhani, Adinda Puspita and Aisyah, Yuniar Adeline Noor (2017) Analisa Anggaran Pelaksanaan Struktur Utama Beton dan Atap Baja Serta Penjadwalan Waktu Pelaksanaan Pada Gedung Teknik Pengairan Universitas Brawijaya - Malang. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3114030031-3114030049-Non_Degree.pdf]
Preview
Text
3114030031-3114030049-Non_Degree.pdf - Published Version

Download (8MB) | Preview

Abstract

Gedung Kuliah Teknik Pengairan Universitas Brawijaya Malang adalah gedung rangka beton beratap baja dan bertingkat enam lantai dengan luas 512 m2. Pada proyek pembangunan ini terdiri dari beberapa pekerjaan yaitu, pekerjaan pendahuluan, pekerjaan struktur bawah, pekerjaan struktur atas sampai struktur atap dimana dibantu dengan menggunakan alat berat.
Biaya pelaksanaan dihitung berdasarkan analisa yang sesuai antara literatur yang digunakan maupun peraturan yang berlaku untuk mendapatkan kesesuaian dengan kondisi pelaksanaan lapangan. Sedangkan pada perhitungan waktu pelaksanaan dilakukan analisa mulai dari kapasitas produksi, produktivitas, durasi dan penyusunan jadwal setiap pekerjaan dimana hal ini dilakukan dengan menggunakan alat bantu Microsoft Project. Dari hasil analisa perhitungan diketahui waktu pelaksanaan proyek tersebut adalah 21 bulan dengan total biaya pelaksanaan sebesar Rp11.573.278.882,00 (Sebelas Milyar Lima Ratus Tujuh Puluh Tiga Juta Dua Ratus Tujuh Puluh Delapan Ribu Delapan Ratus Delapan Puluh Dua Rupiah)
Pelaksanaan
==============================================================================================
Water Resource Engineering Department building was built six floor and using a concrete structure with an area of 512m2. In this project consist of several jobs such as preliminary work, lower structure work, top structural work until steel roofing structure work and it helps by using heavy equipment.
Implementation costs are calculated based on the literature that used to obtain compability with field implementation conditions. Meanwhile on the calculation of the time there are several analyses starting from the production capacity, productivity, duration and manage the schedule by using Microsoft Project. The results of the analysis is time planning for 21 months and plan budget is Rp11.573.278.882,00 (Eleven Billion Five Hundred Seventy Three Million Two Hundred Seventy Eight Thousand Eight Hundred Eighty Two Rupiah)

Item Type: Thesis (Diploma)
Additional Information: RSIS Ram a-1
Uncontrolled Keywords: Biaya Pelaksanaan, Waktu Pelaksanaan
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA681 Concrete construction
T Technology > TH Building construction > TH437 Building--Cost control.
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22401-(D3) Diploma 3
Depositing User: Yuniar Adeline Noor Aisyah
Date Deposited: 16 Nov 2017 02:23
Last Modified: 05 Mar 2019 08:00
URI: http://repository.its.ac.id/id/eprint/43249

Actions (login required)

View Item View Item