Design of Restobarge Garbage and Sanitary Systems

Pratama, Rizqi Ramadhan (2017) Design of Restobarge Garbage and Sanitary Systems. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 4213101033-Undergraduate_Theses.pdf]
Preview
Text
4213101033-Undergraduate_Theses.pdf - Published Version

Download (3MB) | Preview

Abstract

Barge business recently has diminished due to fall of coal industry which mostly delivered by barge. One of the solution is by convert a barge into a floating restaurant. The location of Restobarge selected in Gili Trawangan, Lombok because the average height of the waves in the area is just 0.9 meters and the depth of the sea is 6 meters, making it fit for the location of Restobarge. The statistic said that Lombok especially in Gili Trawangan is one of the most popular place to visit in Indonesia. Barge that used in converting is Barge SM 28 built by PT. Samudra Marine Indonesia. The purpose of this thesis is to design and calculate the Sanitary and Sewage system, design of Garbage Management, and calculate Material Requirement Planning of those systems. Therefore, it could giving the figure of how much it will the cost to the investor. From the data, sanitary system used Medium Galvanized Steel Pipe Ø 1.5 inch as intake pipe from land and suction pipe to hydrophore. From hydrophore to main object used Rucika VP/AW 1.5 inch. The system used Taiko TMC-32-0.75 centrifugal pump as pump to connect with Hydrophore Pressure Tank model Taiko UH-2.0 -1R. In sewage system, suction pipe system used Rucika PVC VP/AW 3 inch as main pipe, so do with discharge pipe. The sewage pump used model Iron Pump Q 4/300. In Garbage Management, the system use a room that connected to the small boat by a Rucika PVC pipe 12 inch. The Barge don’t have a sewage treatment plant because the location of the Restobarge is 55 meters from land which more economical by used small boat to discharge into land. Total cost of material which spend to build RestoBarge is IDR 78.544.500, cost of drawing is IDR 7.000.000, cost of worker is IDR 27.000.000 with total 9 labor and total workday is 23 days. Total Cost needed to build all systems is IDR 115.244.500 with cost of contingencies is 1%, IDR 1.152.000.

Item Type: Thesis (Undergraduate)
Additional Information: RSSP 623.812 9 Pra d
Uncontrolled Keywords: Restobarge, Material Requirement Planning, Sanitary, Garbage management, Design
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering > TC1680 Offshore structures
T Technology > TH Building construction > TH437 Building--Cost control.
V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering
Divisions: Faculty of Marine Technology (MARTECH) > Marine Engineering > 36202-(S1) Undergraduate Thesis
Depositing User: Rizqi Ramadhan Pratama Rizqi Ramadhan Pratama
Date Deposited: 30 Jan 2018 03:01
Last Modified: 08 Mar 2019 06:31
URI: http://repository.its.ac.id/id/eprint/45728

Actions (login required)

View Item View Item